Laserfiche WebLink
Condition I (former Condition J) is amended to reflect a Master Plan <br /> ("Regulating Plan")has been completed that is consistent with the Kona CDP <br /> according to the Kona CDP Design Center. After adoption of the amended <br /> ordinance, the applicant's Regulating Plan should be updated to reflect the <br /> amended ordinance conditions and provided to the Planning Department for <br /> implementation of the Project District. Policy LU-2.4 of the KCDP and Section <br /> 25-6-49.1 of Chapter 25 (Zoning Code)Hawaii County Code, allow amendments <br /> to the Master Plan to be processed by the Planning Director, if authorized in the <br /> Project District ordinance by the County Council. Given the project size, <br /> complexity of implementing new planning concepts of design and smart growth, <br /> and anticipated lengthy duration of the project, it is reasonable to anticipate that <br /> some changes may be needed to the current Master Plan("Regulating Plan"). <br /> Thus, the Planning Director recommends amendment of this condition to give <br /> authority to the Planning Director to approve changes to the Regulating Plan that <br /> are not considered significant. Any changes that alter the permitted land uses, <br /> overall densities, open space and infrastructure requirements or that are contrary <br /> to the Project District ordinance conditions would be considered significant and <br /> require County Council approval. <br /> Condition J (former Condition K) is amended because the applicant has <br /> met the"substantial construction"requirement through rough grading several of <br /> the proposed roadways and providing approximately$22 million in improvements <br /> to water and wastewater infrastructure and the UHWH campus. The Planning <br /> Director recommends establishing a 20-year construction completion deadline for <br /> the Palamanui Project District. This generally aligns with the applicant's proposed <br /> timeframe for completing the project and provides some assurance to the County <br /> and the public that the project will be built out in a timely manner. The condition <br /> is also amended to indicate the applicant must submit site plans for approval by <br /> the Planning Director as the project is developed. <br /> Condition L former Condition M is amended because the variances from <br /> I <br /> Subdivision Code and Zoning Code referenced in the condition are for an old, <br /> -26- <br />