My WebLink
|
Help
|
About
|
Sign Out
Home
2020-11-25 EMC Meeting Agenda and Director's Informational Report (postponed due to technical difficulties)
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2020-2024
>
2020
>
2020-11-25 EMC Meeting Agenda and Director's Informational Report (postponed due to technical difficulties)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 1:29:40 PM
Creation date
11/18/2020 1:29:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• WW Plant Mechanic (Kona): resubmitting RTF for open recruitment. <br />• Storekeeper (Kona): currently in recruitment. <br /> <br />B. VACANT POSITIONS AT RAILROAD OFFICE: <br />• Civil Engineer IV (1 position): currently in recruitment. <br />• Civil Engineer V (1 position): candidate selected. Awaiting decision. <br />• Database Analyst (Hilo): position filled; start date 11/23/20. <br />• GIS Analyst I (Hilo): currently in recruitment. <br /> <br />C. NEW POSITIONS (Need to Create Position Descriptions) <br />• Environmental Engineer (Hilo): currently in recruitment. <br />• Program Manager (Reuse Spec I) (Kona): will begin recruitment in FY21. <br />• WWTPO IV (Kona): packet submitted to Managing Director’s office. <br />• WWTPO IV (Kona): packet submitted to Managing Director’s office. <br />• Plant Electrician/Electronics Repairer (Kona): pending guidance from Corporation <br />Counsel regarding supervision with no supervisor in Kona. <br /> <br />4. WASTEWATER CAPITAL IMPROVEMENTS <br />A. NĀ‘ĀLEHU LARGE CAPACITY CESSPOOL REPLACEMENT: <br />• WWTP Land has been selected. The state EA completion required prior to <br />purchase of land for the treatment/disposal facility. Initial archaeological, flora <br />and fauna checks are in progress. Revised AOC anticipated completion of the <br />final EA is projected no later than 07/23/21. EPA accepted a revised completion <br />date of 08/27/23. <br />• The project is planned for funding with Clean Water State Revolving Funds <br />(CWSRF) monies. <br />• Current Schedule: <br />11/2020: Complete Archaeology and Biology Field Studies. <br />01/2021: Field Study/Literature Review (FSLR) to SHPD for Review. <br />03/2021: Draft EA and Anticipated FONSI scheduled for OEQC publication. <br />02/2022: Draft AIS to SHPD anticipated. <br />05/2023: Section 6E and 106 concurrence anticipated from SHPD/SHPO. <br />07/2023: Final EA publication. <br />01/2024: AMP approval from SHPD. <br />07/2025: WWTP and Phase 1 Collection System Design complete. <br />09/2025: Anticipated advertisement for bids-Phase 1 Construction. <br />07/2027: Nāālehu LCCs closure ʻ– Phase 1 construction complete. <br /> <br />B. PĀHALA LARGE CAPACITY CESSPOOL REPLACEMENT: <br />• Final EA/FONSI was published with OEQC on 03/08/20. Also, the Draft Final AIS <br />was submitted to SHPD on 02/26/20 and approved on 04/20/20. <br />• Subdividing WWTP land has been initiated with KSBE; land acquisition is <br />proceeding through condemnation process. <br />12 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.