<br />Lanihau Force Main replacement project. Line crew was moved to help assist <br />contractor for wastewater diversion to Keopu SPS during this construction work. <br /> <br />E. NORTH KONA SEWER PUMP STATION <br />• This new sewer pump station will be located on the mauka side of Queen <br />Kaʻahumanu Highway. It is to receive wastewater from a portion of the area <br />below Ane Keohokalole Highway between Hina Lani Street and Kealakehe <br />Parkway. The wastewater will be pumped to the Kealakehe WWTP via new force <br />mains. The new sewer pump station is scheduled to be complete in July 2022. <br />• The preliminary engineering report for the new pump station has been finalized. <br />• The Environmental Assessment (EA) process has begun. Consultant was issued a <br />NTP in late December 2019. Draft EA is expected to be complete by November <br />2020. <br />• The county is working on land transfer from West Hawaiʻi Business Park (WHBP) <br />for the SPS site. WHBP received Final subdivision approval in August 2020. <br /> <br />F. FACILITY REPAIR/EQUIPMENT REPLACEMENT PROJECTS: <br />• Pua Sewage Pump Station (SPS) Upgrade: Design items for additional upgrades <br />needed besides pump replacement at the Pua SPS are being worked into a new <br />contract. It will include a complete renovation, including structural, electrical, <br />and mechanical upgrades to the pump station. Cause for renovation is due to <br />deterioration of the wet well from HS; electrical component damage due to HS <br />22 <br />corrosion and the overall age of the facility; and mechanical damage due to <br />faulty discharge line valves due to hydraulic surging. Work is to include <br />upgrading the HVAC; replacing/upgrading components of the electrical system; <br />replacing corroded duct work; upgrading the wet well level control system; and <br />improving on safety issues by eliminating fire and electrical hazards to achieve <br />compliance with NFPA 820 and 70E. DEM is now preparing a Preliminary <br />Engineering Report so the project can qualify for a CWSRF loan to support design <br />and construction. <br />• Pua Force Main (dual FM): DEM is applying for a CWSRF loan for the design <br />effort. CWSRF has placed loan application on hold pending submittal of a <br />Preliminary Engineering Report (PER). County will be attempting to prepare a <br />PER with excerpts from the initial 1990 design. CWSRF has initially approved PER <br />and is preparing commitment letter for funding design. <br />• Lanihau SPS Force Main Replacement: Project will replace approximately 800 <br />lineal feet of pipe form the Lanihau SPS and connect to the manhole at the <br />Palani Road and Kuakini Street intersection. Construction team mobilized on <br />08/17/20. Pre-final Inspection was completed on October 19, 2020. Punch list <br />items are being completed by Contractor. <br />• Repair/Replace Hilo, Kulāʻimano, and Pāpa’ikou WWTP Programmatic Plans: All <br />three WWTPs are nearing the end of their useful life along with being located in <br />corrosive atmospheres, expediting the aging process. Kulāʻimano WWTP is <br />nearing 45 years, Pāpaʽikou is nearing 37 years, and Hilo is nearing 30 years. The <br />work will first conduct a condition assessment to develop a repair and <br />15 <br /> <br />