My WebLink
|
Help
|
About
|
Sign Out
Home
2020-11-25 EMC Meeting Agenda and Director's Informational Report (postponed due to technical difficulties)
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2020-2024
>
2020
>
2020-11-25 EMC Meeting Agenda and Director's Informational Report (postponed due to technical difficulties)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 1:29:40 PM
Creation date
11/18/2020 1:29:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Resubmit AIS (to SHPD): January 2021 (SHPD has been unavailable for <br />site visit.) <br /> Receive SHPD Approval of AIS: April 2021 <br /> Prepare Final EIS: April 2021 <br /> Publish Final EIS: September 2021 <br />• The project has been placed “on-hold” by the mayor because of funding issues <br />and the Maui County (Lahaina WWTP injection wells) U.S. Supreme Court <br />decision. <br />• With the SCOTUS decision, WWD has begun work to award a contract for a <br />consultant to perform a tracer/dye study to determine if KWWTP effluent <br />disposed via the sump is reaching coastal waters (state waters). The previous <br />USGS/DOH study is being used to guide this study. <br />• Other Impacts of the SCOTUS decision/mayor’s “on-hold” of the Project: <br />◦ Final R-1 treatment construction documents were being prepared but have <br />been placed “on-hold.” <br />◦ The subsurface wetland design was stopped at 90%. <br />◦ The SAT design was stopped at 50%. Consultant will need to perform a 6- <br />month pilot-scale SAT for longer-term phosphorus removal performance once <br />project is given the okay to proceed. <br />• The R-1 upgrades to the Kealakehe WWTP began in 2007 as a phased approach. <br />Phase I work installed a reuse line along Queen Kaʻahumanu Highway between <br />the Kohanaiki area and Kealakehe Parkway (completed in 2018). <br />• DOH has earmarked SRF monies in the amount of $54 million to fund both <br />design and construction of the R-1 upgrade at the Kealakehe WWTP. <br />• Received SRF commitment letter for Outside Fence Line (OSFL) consultant <br />contract (Brown and Caldwell). DOH is trying to fund projects on a fiscal year <br />basis, and this has slowed down their execution of the SRF commitment letter. <br />Design work has been suspended and all work to date has been frozen on the <br />SAT and Subsurface Wetlands. Contract terminated as Phase 1 of the OSFL <br />contract. <br />• Design of the North and South R-1 distribution pipelines has been reinitiated <br />under Phase 2 of the OSFL design work. Design contract NTP issued 10/13/20. <br />• Hina Lani DWS 1 MG Reservoir (tank) transfer to DEM is awaiting NTP on the R-1 <br />OSFL consultant design contract. <br />• Aliʻi Drive Salinity Study: Work on sampling salinity to identify if seawater <br />intrusion is infiltrating faulty sewer pipelines along Aliʻi Drive has begun. Both <br />the Keopu SPS and Lanihau SPS service areas show I/I occurring during high tides. <br />Hale Halawai SPS shows little or no salinity resulting from sea water I/I. CCTV of <br />the affected gravity sewers servicing the Lanihau SPS and Keopu SPS revealed <br />that numerous joints have separated. Approximately $200,000 has been <br />directed to purchase CIPP kits to seal the joints. Also, a new CCTV camera has <br />been purchased to video the laterals in this section. Crews have started to install <br />the CIPP kits from the week of 07/27/20. Approximately 700 LF of sewers were <br />lined with the CIPP kits to date. On 08/17/20, work was suspended for the <br />14 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.