My WebLink
|
Help
|
About
|
Sign Out
Home
2022.03.01 Rules of Practice and Procedure of the Department of Environmental Management
PublicDocuments
>
Environmental Management
>
Admin Rules & General Documents
>
Former (obsolete) rules
>
2022.03.01 Rules of Practice and Procedure of the Department of Environmental Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2022 2:46:31 PM
Creation date
12/15/2020 11:31:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and maintain a residential pumping station at the owner's own expense. Such <br />pumping station shall be privately owned and operated. The owner shall be <br />responsible for acquiring all permits, including proper building permits, for the <br />pumping station. <br />(c) Request for extension of time to connect. <br />(1) To obtain a time extension of the 180 days to connect to an accessible <br />sewer, owners shall file a written request to the director before the <br />expiration of the 180 days. Such request shall contain all of the following: <br />(A) Documentation to support the reason for the extension; <br />(B) The amount of additional time required, not to exceed two (2) years; <br />(C) Identification of the property by tax map key and physical address; <br />(D) Documentation of authority to make such request, if not the owner; <br />and <br />(E) Verification of intent and ability to connect within or by the requested <br />time period. <br />(2) Based on the information provided, the director may deny the request or <br />grant an extension not to exceed two (2) years. <br />(3) The director's decision may be appealed to the commission, pursuant to <br />Chapter 21, HCC. <br />RULE 18 Permit to Connect or Disconnect <br />18-1. Connect or Disconnect. Connection or disconnection from the public sewer <br />system requires completion and approval of a Permit To Perform Work On The Public Sewer <br />System department form, along with a nonrefundable permit fee of $150. <br />(a) The connection permit may be issued only after a plumbing permit has been <br />issued by the building division, department of public works. <br />(b) Construction may begin only after the Permit To Perform Work On The Public <br />Sewer System has been approved. <br />18-2. Inspections. <br />(a) Inspection by the wastewater division is required prior to backfilling. <br />(b) The permittee shall schedule inspections with the wastewater division at least <br />2 business days in advance. <br />M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.