My WebLink
|
Help
|
About
|
Sign Out
Home
Chapter 05 Construction Administrative Code
PublicDocuments
>
County Clerk - Council
>
County Clerk
>
County Code
>
Chapter 05 Construction Administrative Code
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 4:18:00 PM
Creation date
4/8/2021 4:27:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C ONSTRUCTION A DMINISTRATIVE C ODE§ 5-7-3 <br />PERMIT FEES <br />General Construction <br />Valuation Fees <br />$0 to $500 $10 <br />$10 for the first $500 plus $1.50 for each <br />$501 to $2,000 additional $100 or fraction thereof, to and <br />including $2,000. <br />$32.50 for the first $2,000 plus $7.50 for <br />$2,001 to $25,000 each additional $1,000 or fraction thereof, <br />to and including $25,000. <br />$205 for the first $25,000 plus $6 for each <br />$25,001 to $50,000 <br />additional $1,000 or fraction thereof, to <br />and including $50,000. <br />$355 for the first $50,000 plus $3 for each <br />$50,001 and up <br />additional $1,000 or fraction thereof. <br />Other <br />Carport, garages, porches, $10 per 100 sq. ft. or fraction thereof. <br />patios or lanais and <br /> <br />detached U structures. <br />(c) Valuation. <br /> The determination of average construction costs shall be based upon the most <br />recent building valuation data published by the International Code Council, Inc., <br />4051 West Flossmoor Road, Country Club Hills, IL, 60478-5795. This valuation <br />data is based on typical construction methods and for the purpose of determining <br />permit fees necessary to fund code compliance activities. <br /> The valuation shall consist of the total average construction cost, per square foot, <br />of all construction work for which the permit is issued, including all finish work, <br />painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire- <br />extinguishing systems and any other permanent work, permanent equipment, or <br />work exempt from permitting. <br /> Differences in actual bids or contracts for specific construction projects and <br />valuations derived from International Code Council building validation data, shall <br />not invalidate the latter figure. <br />SUPP. 9 (1-2021) <br />5-31 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.