My WebLink
|
Help
|
About
|
Sign Out
Home
2021-07-01 Windward Exh C Kirpal Meditation & Ecological Center SPP 20-220
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2021
>
2021-07-01 Windward Exh C Kirpal Meditation & Ecological Center SPP 20-220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2021 11:43:28 AM
Creation date
8/5/2021 11:43:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUSSMAN: We are in the process of interviewing engineers at this time. I've employed Val <br /> Colter to begin the process and she has already provided or is working on 2 permits to redo the <br /> other ones. Regarding the engineer we're going to have to hire one, we have one from Teak <br /> Bali. We might use them and their engineers. So, I haven't hired anybody yet but, we are <br /> looking for one. If you could recommend any I'd be happy to do that. <br /> RAFFIPIY: Well because you will have to have building permit, you'll have to have electrical <br /> permit and a plumbing permit. So, I'm just wondering if you have everybody line up that will be <br /> approving all these for issuing and signing off on the application for the building permit, <br /> electrical permit, and plumbing permit. <br /> SUSSMAN: The answer is no; we don't have everybody lined up at the moment. The first order <br /> of business in my mind was to first know that I'm going to have a true retreat center. I still don't <br /> know if I'm going to have a retreat center because you've haven't vote. If you don't approve it <br /> then there's no point in getting anybody to approve anything because we're not going to a have a <br /> retreat center. It's going to be my home. If you do approve it, I'll go ahead and hire the <br /> appropriate people, find them, and hire them to get it approved. That was my thinking, maybe <br /> incorrectly so but, we do have I have to do I have to say we have a very professional general <br /> contractor type of person who's built many, many facilities on the mainland from shopping <br /> centers to office buildings and so forth that is helping me through this process. <br /> RAFFIPIY: All right, thank you. <br /> SUSSMAN: You're welcome. <br /> REPLOGLE: Is there anything else fellow, yes Mr. Lin? <br /> LIN: Thank you Chair Replogle. This is a question for the Planning Director, Mr. Kern. So, <br /> based on the photos I've seen in the background report this is from the applicant or from actual <br /> staff photos that went to inspect the property? <br /> KERN: I will have to defer to staff for that one. All the stuff from the road would be our staff <br /> property, Maija can you confirm or Eric? <br /> JACKSON: Yeah, I believe that these photos provided in the application were take by the <br /> applicant and then the photos that we presented of the road in that power point presentation today <br /> were taken by staff. <br /> LIN: So, I guess my question would be how are we verifying that all these violations and the <br /> concerns about setbacks are actually accurate? <br /> SUSSMAN: I could speak to that. <br /> REPLOGLE: Please Mr. Sussman. <br /> 10 <br /> EXHIBIT C <br />
The URL can be used to link to this page
Your browser does not support the video tag.