Laserfiche WebLink
Works has said that they wanted on the south side. You know, we are asking for deferral <br /> of this until such a time as the middle school is built. It's not going to make any <br /> difference whether it's on the north side or the south side. <br /> VITOUSEK: I think once we have information about whether there is feasibility of <br /> building on the north side and whether that would be, would make it easier for the <br /> applicant to complete those requirements now, we can make that decision. If we come <br /> back with the same information we have now saying that, or information saying no, it's <br /> got to be on the south side, and those requirements are so stringent that we cannot move <br /> forward with them at this time, we will have information to then say hey, we agree, <br /> you've got to move forward with your building, and we can't do it under these <br /> conditions, so we move forward, in my opinion. But without that information, without <br /> exploring the option of putting in those safety improvements now in a more cost-effective <br /> manner, then I don't think we have all the information we need. Commissioner <br /> DeFranco. <br /> DEFRANCO: Yeah, I'm just wondering if we can get someone from the county to weigh <br /> in on this a little bit. <br /> JACKSON: I can speak to the timing. So the Planning Department will certainly help <br /> facilitate that conversation between the applicant and Public Works and the Traffic <br /> department. It will probably take a few weeks. And then I don't know if, Chair <br /> Vitousek, you are asking for the applicant to actually determine whether they can put in <br /> engineering cost on sidewalks on the north side of the road and bring that back to the <br /> hearing. That may take a little bit longer to do, so <br /> VITOUSEK: Yeah, I wouldn't, wouldn't be asking for a full cost, but I would be asking <br /> for an analysis of whether that can be done by the applicant, whether that can be done at <br /> the same time as the gym. Mr. Kirk. <br /> KIRK: I, I don't recall the exact number, but I don't believe the cost was significantly <br /> different for where the sidewalk is; the difference is just inconveniencing fewer of the <br /> residents on the south side. <br /> VITOUSEK: Did you guys do a cost analysis of both options? <br /> KIRK: I believe that we did. I <br /> VITOUSEK: Okay, well, that would be definitely helpful information to have when, if <br /> we come back, after deferral, to have the information for sure that we are saying hey, this <br /> doesn't affect it in any way or it does and here is what we can do. <br /> KIRK: Certainly, we can provide whatever materials we have. <br /> 17 <br /> EXHIBIT C <br />