My WebLink
|
Help
|
About
|
Sign Out
Home
PD BACKGROUND REPORT (SPP-21-228)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2021
>
2021-10-07 Windward
>
Item #3 Arts and Sciences Center (SPP-21-228)
>
PD BACKGROUND REPORT (SPP-21-228)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 8:29:30 AM
Creation date
9/28/2021 8:23:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. John Pipan, Planning Administrator <br /> Ladd Planning Hawaii LLC <br /> January 27, 2021 <br /> Page 2 <br /> Wastewater: <br /> 2. The application includes wastewater calculations, requirements, and approval for individual <br /> wastewater systems (IWS) from 2010 and 2011 to service the previously proposed <br /> commercial center on the property. As the applicant is proposing to develop a different use <br /> that is likely to produce significantly more wastewater than the previous use, please provide <br /> the Planning Department with new wastewater calculations produced by a licensed engineer <br /> for the school use. Per staff's conversation with DDH-Wastewater Division, the calculations <br /> should include information on maximum number of users (students and faculty), number of <br /> proposed restrooms (toilets & sinks), and information rclatcd to anticipatcd wastewater <br /> produced by the proposed cafeteria. PIease summarize the findings of the calculations in the <br /> wastewater section of the resubmitted application. <br /> Traffic: <br /> 3. State Department of Transportation(DOT)reviewed the draft Traffic Impact Analysis Report <br /> (TZAR) submitted with the subject application and by letter dated December 8, 2420, <br /> requested a significant amount of additional information before the TIAR would be accepted. <br /> Your application indicates that you are in the process of addressing these issues and will be <br /> resubmitting a new draft TZAR to DOT. Before we can accept this application as complete, <br /> we will need DOT concurrence that the final TIAR is complete and acceptable. Please also <br /> summarize the findings of the accepted TIAR in the traffic section of the resubmitted <br /> application. <br /> Finally, please note that if the applicant is unsuccessful in obtaining County water to address the <br /> school's potable and fire suppression needs, they will likely need to redesign the facility layout <br /> to accommodate potable water and fire suppression tanks on-site. <br /> Unless otherwise requested, we will retain the $500.00 filing fee in anticipation of the re- <br /> submittal of the Special Permit application. if you have any questions, please feel free to contact <br /> Christian Kay at (808) 951-8136. <br /> Sincerely, <br /> 41Lk+ ��'j.,/ <br /> ZENDO KERN <br /> Planning Director <br /> CRK:jaa <br /> 11coh331,planning'Tublinwpwin6O\CKaylPlanning CommissioziTettm\SPP RetumTP.panASCSPPRetum.dnc <br /> Enclosures: Original and Copies of Application <br /> Receipt No. 676093 <br />
The URL can be used to link to this page
Your browser does not support the video tag.