My WebLink
|
Help
|
About
|
Sign Out
Home
2007-01-05 tginger
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2007
>
2007-01-05 tginger
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 8:43:04 AM
Creation date
6/13/2011 8:42:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GRAHAM: Any other -? <br />GALDONES: Excuse me, Mr. Chair. <br />GRAHAM: Commissioner Galdones. <br />GALDONES: Thank you, Mr. Chair. I would have to vote against the motion as is. The <br />reason is because if you look at the layout of this application, there are not too many options. <br />There’s not many, many options up there. There are a few options to be considered. And even <br />after the Department of Transportation comes up with their recommendation, I’m sure all of us <br />on the Commission here is not going to agree to everything that they came out with. We will <br />have our own ideas of what they shouldn’t be doing. So I still believe that the condition as stated <br />is a good one, leave it to the body who has the expertise to deal with it because the options are <br />not that many for them to consider. And I’m sure they’re going to try to mitigate the concerns <br />that we have been expressing here today. <br />Now the problem I have with the motion is that it’s open-ended and it may go beyond the four <br />months, beyond the 90 days. I’d rather, if we have a split in the Commission, what I’d rather see <br />is no action taken by the Commissioners and after the 90 days submit it up to the County Council <br />with no recommendation or no action by the Commissioners, instead of leaving it open ended <br />and go beyond the 90 days just to get the TIAR which I feel because, as I stated, they don’t have <br />a heck of a lot of options for consideration there. And I’m sure that we’re going to have to trust <br />the process as Mr. Lim has stated; and I agree, in this particular case, I agree with his statement. <br />And that is why I have a difficulty with the motion as stated. <br />GRAHAM: I can personally just say, as far as how I feel, about the route we’re <br />planning to take I think is great about resubmitting the different traffic, different ingress/egress <br />option, if that goes around and we get comments. When we hear from DOT we don’t typically <br />just hear, “Well, we don’t have any comment for the TIAR,” they’ll generally make a bunch of <br />comments. So when it comes back to us my personal take will be given the comments given <br />then the Police Department, Public Works, whatever, if it looks to me like the TIAR is more just <br />technical issues like how long the left-turn lane should be or something like that, then I would <br />feel comfortable supporting we go forward. But if I felt I would still be in the same position I <br />am in right now, then I wouldn’t. So I just can’t say it at this point in time. Thank you. <br />Commissioner Alameda? <br />ALAMEDA: Thank you, Mr. Chair. Just in response to Commissioner Galdones, I <br />agree, I think the options are limited and then, therefore, to me it’s apparent to a nonprofessional, <br />nonexpert; and that’s why I have a hard time voting in favor of this motion on the application. <br />GRAHAM: Commissioner Siracusa, I guess, should we carry forward with your <br />motion at this time, your motion being one to require a TIAR before it comes back to us? Or, <br />you know, the applicant had a different suggestion that I just spoke to. And what would you <br />prefer? <br /> EXHIBIT B 31 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.