My WebLink
|
Help
|
About
|
Sign Out
Home
2022-01-07 EMC special meeting draft minutes
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2020-2024
>
2022
>
2022-01-26
>
2022-01-07 EMC special meeting draft minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 3:13:05 PM
Creation date
1/20/2022 12:30:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
year. And then more recently, the house has maybe a weekend a month or two or three weeks <br />a month, depending on family usage of it, vacations and stuff like that. <br />GAFFNEY: So all the use is by the family. It's not a rental unit. <br />HENDERSON. Family and family friends, close friends. <br />GAFFNEY: Thank you. <br />CHAIR: Are there any other questions from the commissioners, or having heard that, from <br />Appellee? <br />KEKAI: No questions. <br />ADAMS: Okay. Seeing none. We'll move on to the Appellee’s case. Ms. Kekai, which exhibits and <br />witnesses are you calling? <br />KEKAI: First witness is Director Ramzi Mansour. <br />ADAMS: Okay. Ramzi Mansour, do you solemnly swear or affirm that the testimony you are <br />about to provide is the truth, the whole truth and nothing but the truth? <br />MANSOUR: I do. <br />ADAMS: Thank you. Is Exhibit G your written testimony? <br />MANSOUR: That's correct. <br />ADAMS: Do the commissioners need any time to read through Exhibit G? All right. Is everybody <br />okay? Moving on, then. Do you have anything to add Mr. Mansour? Director Mansour, to your <br />written direct testimony? <br /> <br />MANSOUR: Just as I was listening to Mr. Henderson’s comments about the Y connection to the <br />sewer. Every Y can be considered as a separate connection. So you pretty much have two <br />connections tied into the main sewer line. You don't have that standalone building, you don't <br />need the Y connection unless you only have one connection, which is one unit. In his own <br />definition of describing the property, he is stating in page 2, the main building and separate <br />building. The definition for a building within our chapter is very clear. It says building a house or <br />sewer means that portion of the sewer line extending from a building to the public sewer. And <br />he just stated he had a Y connection to that sewer, so that by itself gives the impression it is <br />two separate buildings, two separate connections. In addition to that, I just state it is, when I <br />first took on that request, and it's not an easy decision that was made. I had to speak to my <br />staff. I had to do research, and the code is very clear. When the code was written, it went <br />through public hearings. Mr. Henderson, could easily have attended these public hearings and <br />9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.