My WebLink
|
Help
|
About
|
Sign Out
Home
PD BACKGROUND REPORT (PL-REZ-2022-015_AMEND REZ-05-027)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2022
>
2022-04-21 Leeward
>
Item #1 Clinton Hinchcliff, Jr. (PL-REZ-2022-015_Amend REZ-05-027)
>
PD BACKGROUND REPORT (PL-REZ-2022-015_AMEND REZ-05-027)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2022 12:17:04 PM
Creation date
4/13/2022 12:15:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
It should also be noted that because the technical deadline of June 2016 has expired, <br /> this report is structured as though this were an original rezoningquest. In so <br /> doing, it enables the Director and Leeward Planning Commission to review and <br /> process this request as though it were either a new rezoning application or a time <br /> extension request. <br /> M. REZONING CONDITIONS <br /> As noted earlier, the subject property was initially rezoned into the FA-3a district <br /> on June 16, 2006,subject to a number of conditions. (Exhibit A). Albeit belated, <br /> this section will cover the status of the various conditions. The conditions are noted <br /> in parenthesis with the response in italics. <br /> A. "The applicants, its successors or assigns shall be responsible for complying <br /> with all of the stated conditions of approval." <br /> The new Applicant is now the landowner and intends to comply with the existing <br /> and any new or amended conditions. <br /> S. "The applicants, successors or assigns shall be responsible for complying with <br /> all requirements of Chapter 205, Hawaii Revised Statutes,relating to <br /> permissible uses within the State Land Use Agricultural District." <br /> The Applicant will comply with this requirement. <br /> C. "The applicant shall submit the required water commitment payment to the <br /> Department of Water Supply." <br /> In a letter, dated October 27, 2021, the Department of Water Supply <br /> acknowledged receipt of the water commitment deposit for the six (6) additional <br /> lots. (Exhibit Q <br /> D. "Final subdivision approval of the proposed agricultural subdivision shall be <br /> secured from the Planning Director within five (5)years from the effective date <br /> of the ordinance. The applicant shall reserve the following easements and <br /> special setbacks in perpetuity for purposes of protecting and maintaining <br /> naturally forested areas and shall delineate such easements and setbacks on <br /> plans submitted for subdivision review: <br /> 1. a 60-foot wide "forest reserve easement" along the existing roadway <br /> frontages of the subject property,exclusive of the access point permitted by <br /> the Department of Public Works. <br /> 2. a 30-foot-forest reserve easement" along all lot lines not covered by the 60- <br /> foot easement; and <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.