My WebLink
|
Help
|
About
|
Sign Out
Home
PD BACKGROUND REPORT (PL-SMA-2022-012_AmendSMA-07-024_&_PL-REZ-2022-014_AmendREZ-07-075)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2022
>
2022-04-21 Leeward
>
Item #2 Hawaii One1 Investors, LLC (formerly Kona Heights, LLC) (PL-REZ-2022-014_Amend REZ-07-075)
>
PD BACKGROUND REPORT (PL-SMA-2022-012_AmendSMA-07-024_&_PL-REZ-2022-014_AmendREZ-07-075)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2022 12:30:26 PM
Creation date
4/13/2022 12:20:27 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o Upon acquiring the subject property in August 2013, Applicant able to secure <br /> a five (5)year administrative time extension until February 9, 2019 by which <br /> to complete the proposed subdivision (Exhibit F-Time Extension <br /> Administrative Approval). <br /> o The subdivision application for La`ipala Makai-Phase 1, consisting of 18 <br /> single family residential lots, was submitted to the Planning Department on <br /> June 7, 2017; <br /> o Tentative Approval of the proposed Phase 1 subdivision issued by the <br /> Planning Department on September 19, 2017 (Exhibit I-PD Subdivision <br /> Tentative Approval); <br /> o Amended Tentative Approval issued on October 25, 2018, incorporating a <br /> new direct access roadway (Pi`ilani Street)from Alii Drive to the proposed <br /> subdivision (Exhibit J-PD Amended Subdivision Tentative Approval); <br /> o By letter dated September 17, 2018, the Planning Department grants a time <br /> extension until September 19, 2020 by which to comply with all conditions of <br /> the Amended Tentative Approval (Exhibit K-PD Time Extension to TA); <br /> and <br /> o Plans for the construction of the subdivision infrastructure and lot layout was <br /> approved by the County on February 13, 2019 (Exhibit L-PD Construction <br /> Plan Approval). <br /> _. Access to the development shall meet with the approval of the Department of Public <br /> Works. Access to the future Kahului-Keauhou Parkway shall not be allowed unless <br /> approved the Department of Public Works. Vehicular access to individual lots shall <br /> not be permitted from the Kahului-Keauhou Parkway. A gated vehicular emergency <br /> egress to the Kahului Keauhou Parkway may be installed if allowed by the <br /> Department of Public Works. The applicant shall construct a pedestrian pathway <br /> connecting a street within the project to the multipurpose path on the Kahului- <br /> Keauhou Parkway. <br /> • With the approval of subdivision construction drawings by the County, the <br /> Applicant has adhered to and satisfied this condition. <br /> G. During the construction of the proposed subdivision, the applicant shall cause <br /> vehicular construction traffic to utilize an access route across the property to the west <br /> and/or south. <br /> • The Applicant will comply with this condition by directing construction-related <br /> traffic through the adjoining property to the west that it also owns. <br /> 11Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.