Laserfiche WebLink
the director approve a variance? Should they be exempted from putting them in or <br /> allowed to modify the requirements? <br /> C. Section 25- 4- 54.2 (a) allows the director to modify the number of required DC fast <br /> chargers that would be installed in place of the level two chargers as long as the same <br /> capacity was met. One of the P and R comments was that it would be good to have a <br /> ratio here. A 50kW DC fast charger basically runs 7 times faster than a level 2 <br /> charger. So, the basic formula would be that every DC charger could replace 7 Level <br /> 2 plugs (1 DC =7 Level 2 plugs). However, it is important to remember that not <br /> every car can plug in to a DC Fast charger. The formula could be better addressed by <br /> allowing one DC charger to replace 6 Level 2 plugs, with a companion requirement to <br /> have at least one Level 2 plug alongside the DC fast charger or a Level 2 plug <br /> included on the DC fast charger which is how many are designed. <br /> 4 <br />