Laserfiche WebLink
JACKSON: Oh, I see, let me zoom out. I think you may be referring to the private sewer that's <br /> in place in Keauhou, and we do not have a map of that. <br /> VITOUSEK: Okay. <br /> JACKSON: This map just shows the County sewer system. <br /> VITOUSEK: Okay. <br /> ARAI: Sorry, Maija, this is Daryn. I was wondering if you turned off the road center line, <br /> would that show visually where the sewer line is located? Yeah, and then if you zoom in, I think <br /> the red lines will show you where the lines are. And I took a quick look at the construction <br /> drawings, and even though I'm not an engineer, it does appear from the engineering, civil <br /> drawings that the line will come down Pi`ilani Street, which is the new access road that will <br /> connect directly with Alii Drive and then connect with the sewer line heading north that's <br /> already within Alii Drive. But there is no extension south as currently planned. <br /> VAN BERGEN: And that's correct. I said south, and I apologize; I meant north. But if you <br /> look at the construction plans, page 29, 30, and 31, it shows the sewer profile, and Daryn is <br /> correct; it comes down the newly created Pi`ilani Street, takes a right and heads north and <br /> connects to the Alii Drive sewer. That's the plans that were submitted to the County. <br /> VITOUSEK: Okay. Director Kern. <br /> KERN: Thank you, Mr. Chair. I just wanted to also just quickly follow up; you asked the <br /> question on the analysis, and I just wanted to state for the record and tell all the commissioners, <br /> everyone who is watching for that matter. When somebody comes in for a time extension, be it <br /> a rezoning or an SMA, we don't just look at it as a time extension for that condition; we actually <br /> do a full analysis of the entire application, the entire request again, as if it were a brand-new <br /> application. We send out to the various departments and agencies for their requests and <br /> comments, and anything that may have changed between the original time of those conditions <br /> and now that would be necessary, those conditions are then amended. So just wanted to make <br /> sure that that was clear to everybody that we do a full analysis on it, not just looking at a time <br /> extension, even though that's what the request is really showing. So if there are any questions to <br /> that, myself or staff are happy to answer any of those. Thank you. <br /> VITOUSEK: Mr. Fuke. <br /> FUKE: I've got to unmute myself. Now, I'm just kind of trying to follow up on what, you <br /> know, Maija Jackson, as well as your counsel Jean Campbell had raised about, you know, like <br /> when you are looking at conditions, you need to address the nexus question, you know, and also <br /> the proportionality. So in years past just to provide some background to address this issue <br /> the, you know, at the request of the Council the County Planning Department came out with an <br /> overall like impact analysis, and based upon that then they arrived at this formula for your fair <br /> share contribution, one which would address roadways, wastewater system, solid waste, fire, and <br /> police protection, and parks, I'm sorry, so, you know, and that has been kind of like the so-called <br /> 15 <br /> EXHIBIT D <br />