Laserfiche WebLink
line. We talk about, ÐShould actual construction of the subject property not commence <br />within three years from the effective date of this ordinance.Ñ WeÓre going to request that <br />it be amended to the Ðeffective date of the Final Plan ApprovalÑ because the conditions <br />later on in the document give the Applicant five years to get Final Plan Approval. <br />Condition I, the change is intended to point out the fact that we can construct and submit <br />the improvements to the County for dedication but we canÓt control the date that they <br />accept it. And so we wouldnÓt want to be held up because, for whatever reason the <br />County Council do not want to accept it. You know, we would by then have finished the <br />construction, submitted the dedication deed to the County; and thatÓs really all that we <br />can control. So we donÓt want to have, you know, for whatever reason, the Certificate of <br />Occupancy held up for that reason. <br />Next condition change proposed is Condition J. This is a condition change that was <br />talked about at the County Council level for the University of the NationsÓ project, and it <br />was in one of our response letters to the agencyÓs comments. Essentially what weÓre <br />doing is deleting references to a proposed storm sewer system which is identified by the <br />Master Plan for Kailua-Kona. We had a discussion with Public Works. And as their <br />comments on this application show, I donÓt think that they are going to be requiring that <br />the retention basins or other criteria that were mentioned in the Master Plan be <br />implemented on this project. So the condition weÓre proposing, as you see the <br />amendment here are, is that which was adopted for the, by the County Council for the <br />University of the NationsÓ project. <br />The other condition amendments that you see are technical amendments just to make the <br />conditions of approval generic so that if we develop units or lots on the project that it <br />would just apply to both, as applicable. <br />So weÓd be happy to answer any questions. I think what, with respect to the Condition <br />No. J, thatÓs why we submitted this exhibit, the tax map showing the flood control areas <br />for the area. What youÓll see is, to the north, youÓll see the floodways, the AE floodways <br />significantly to the north of the property; and then, itÓs not quite shown but just very little <br />bit on the south side of the property, thereÓs another one that comes down and goes into <br />the area by the University of the Nations. So weÓre requesting that the, any of the <br />improvements that were initially mentioned in the Master Plan for the storm sewer <br />system be deleted from the condition as we believe the Departmen <br />not required that. <br />GALDONES:Mr. Lim, could you speak to DarynÓs proposal for the ne <br />regarding the pedestrian and bicycle pathway? <br />LIM:Okay. I guess, you know, IÓll let Brian do that. <br />COOK:Yes, we did not talk about this before. As you look at our <br />proposed layout right now, the boundary adjacent to The Pines, we have five building <br />groups abutting up to The Pines. As stated earlier, these are, there are 16 units in each <br />20 <br /> <br />