My WebLink
|
Help
|
About
|
Sign Out
Home
PD RECOMMENDATION REPORT (PL-REZ-2022-023)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2022
>
2022-08-04 Windward
>
Item #4 Ke'Aloha Lani, LLC (PL-REZ-2022-000023 / Amend REZ-17-000218)
>
PD RECOMMENDATION REPORT (PL-REZ-2022-023)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2022 12:46:51 PM
Creation date
8/1/2022 12:46:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Shipman Road to the property via two side by side 25-foot wide road and utility <br /> easements located via the flagpole portions of TMK's: 1-6-141:001 and 024 and continue <br /> over TMK's: 1-6-141:027 and 028. In 2017,the Department of Public Works did not <br /> recommend improvements because access to the property is over private lots with utility <br /> and roadway easements. However, due to several of the industrial rezonings previously <br /> approved along Milo Street a condition of approval in Change of Zone Ordinance No. 17 <br /> 65 required the applicant to comply with the standards outlined in the Standard Details R- <br /> 33 and R-34 for Public Works Construction prior to issuance of a Certificate of <br /> Occupancy. Standard Detail R-33 identifies the street cross section for business and <br /> industrial standards,which is a 60-foot wide right of way with 12-foot wide paved travel <br /> lanes, 8-foot wide paved shoulders and 10-foot wide paved drainage swales. The <br /> applicant has proposed to amend Condition I`s timing trigger for roadway improvements <br /> to be Subdivision Approval rather than Certificate of Occupancy. <br /> The Planning Director believes that the timing trigger for this condition should be <br /> Certificate of Occupancy, for any new structures excluding structures that do not require <br /> a certificate of occupancy. Thus, a storage building and utility shed would not trigger it; <br /> however a new beverage facility would trigger that improvement for the subject parcel's <br /> road and utility easement access. Futhermore, if and when the property is subdivided <br /> and/or a condominium property regime (CPR)has occurred,the road improvement <br /> requirements of the Subdivision Code would be triggered,which would provide <br /> improved shoulders, drainage swales, etc. Lastly, the Planning Director is proposing to <br /> remove the Standard Details for Public Works Construction,which is specific and may <br /> change if changes are made to DPW's Standard Details or the Subdivision Code and <br /> replace it with the following to be added to Condition I"with the requirements of Chapter <br /> 23, Hawaii County Code (Subdivision)." <br /> DWS system standards require that a minimum flow of 2,000-gallons per minute <br /> for a 2-hour duration and a pipeline velocity of less than 10-feet per second be available <br /> at the site for fire protection for industrial land uses. The existing 4-inch waterline <br /> fronting the property is inadequate for fire protection and the nearest fire hydrant is more <br /> than the required 150 feet from the property. Based on the preceding, a condition of <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.