My WebLink
|
Help
|
About
|
Sign Out
Home
PD RECOMMENDATION REPORT (PL-REZ-2022-023)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2022
>
2022-08-04 Windward
>
Item #4 Ke'Aloha Lani, LLC (PL-REZ-2022-000023 / Amend REZ-17-000218)
>
PD RECOMMENDATION REPORT (PL-REZ-2022-023)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2022 12:46:51 PM
Creation date
8/1/2022 12:46:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
approval required a fire hydrant to be located within 150 feet of the property. In addition, <br /> a condition of approval required the existing 4-inch waterline fronting the subject parcel <br /> to be upgraded to a 12-inch waterline for a distance of approximately 800 feet or the <br /> applicant must provide a private water system capable of providing a minimum flow of <br /> 2,000-gallons per minute for a 2-hour duration and a pipeline velocity of less than 10 feet <br /> per second. <br /> The condition of approval in Change of Zone Ordinance No. 17 65 required the <br /> applicant to provide fire suppression measures prior to the receipt of Certificate of <br /> Occupancy of any structure. At this time, the applicant is requesting that this condition be <br /> deferred to the Subdivision process and not prior to Certificate of Occupancy. However, <br /> it should be noted that the applicant does not have future plans to subdivide the property <br /> and the proposed microbrewery or any other industrial land use can be developed on the <br /> property without the need to subdivide the property. The applicant believes that the <br /> requirements for fire protection will be addressed via the building permit process as the <br /> Fire Department is one of the reviewing and approving agencies during such process. The <br /> applicant continues to state that during the building permit process, the Fire Department <br /> will address any necessary water requirements for providing fire protection consistent <br /> with the appropriate Fire Code in effect at that time. Based on the preceding,the <br /> applicant has proposed to amend Condition E's timing trigger to be Subdivision Approval <br /> rather than prior to Certificate of Occupancy. <br /> The Planning Director believes that the timing trigger for this condition should <br /> not be changed because this requirement is a necessity for health and safety measures for <br /> any proposed industrial use on the subject parcel. The Planning Director also understands <br /> that the Fire Department will review the plans against their code at some time. Based on <br /> the preceding,the Planning Director does not support the applicants request to defer the <br /> tuning trigger to Subdivision approval however,the Planning Director is recommending <br /> the following to be added to Condition E"and/or another method of providing fire <br /> protection as approved by the Fire Department"to account for Fire Department's ability <br /> to instruct the applicant on which measures must be made and when. <br /> -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.