Laserfiche WebLink
YUEN:You could develop the lots as, apart from the site work issues, <br />you could develop the lots as separate entities by having an easement over Lot 38 for <br />the driveway to Lot 37. <br />FUKE:I understand. And you know, they're willing to make that <br />concession relative to the Kwili Street end because of, you know, the significance of <br />Kwili Street versus, you know, these feeder streets. <br />YUEN:Yes. <br />FUKE:But relative to like having an easement connection mandated over <br />here because it's a feeder street rather than a, you know, the major thoroughfare on <br />Kwili Street, I think they would like to not be mandated to have that requirement as an <br />easement. They know it's possible, but they don't, they do not want to have that to be <br />mandated. <br />YUEN:Yeah. Let me give the Commission my take on this. And tha <br />that we would like to retain the present condition; and there's a couple of points here. <br />One is that discussing the change in grade, if you, there is a significant change -. What <br />he's showing is two there versus one, two is the high and one is the low. But the <br />change in grade is not along the property line, it's some place into two. So you can't, <br />you can't develop the site that way without a lot of site work. I mean you can't develop <br />the site at two different grades without moving the building closer to Kwili Street, and <br />then the whole site plan might not even work anyway. <br />FUKE:That is correct. That's why I'm saying to begin with, they're <br />going to have to make some revisions to the site plan. You know, notwithstanding the <br />topographic situation that you pointed out, but also like any other conditions that may <br />be, that ultimately come up. If they decide to respect the existing grade, which may <br />become at this point over here, then they probably would develop at that point over <br />here and have, yeah, like your landscape screen and not have your, a firewall <br />constructed right at the property line. <br />YUEN:There's, and then the driveway connection would have to be <br />roughly as steep as the, if you stuck with the Department's recommendation, would <br />have to be roughly as steep as the existing rise of Laukapu Street to Kwili Street. <br />That's basically what you'd have to build there, and it doesn't, I don't know, it doesn't <br />seem like a huge site work issue. <br />FUKE:Well, that's why, as I mentioned, you know, it's not only the site <br />work issue -. <br />YUEN:Yes. <br />10 <br /> <br />