initial areas of concern. DPW responded (Appendix B), noting a separate consultant contract <br />seeking a similar assessment of the permitting process. With the current assessment in place, <br />the PIG's ability to provide a complete assessment was limited as we did not want to interfere <br />with, or overlap, the consultant's tasks. Accordingly, we significantly pared down the extent of <br />our work as reflected in the following information, which may conflict with the eventual <br />consultant review or already being pursued by DPW. The Commissioners appreciated the <br />consideration of the departments to participate in the gathering of information while <br />determining areas for improvement. <br />EVALUATIONS & CONCLUSIONS <br />The Commissioners conducted an evaluation of the building permitting process to determine <br />how to incorporate efficiency and alterations in the process. The focus was on several areas: the <br />permitting process, the effectiveness of the EPIC system, public education, and oversight of the <br />entirety of the program. <br />Permitting Process <br />Evaluation: The permitting process was reviewed to determine faster permitting response <br />times for smaller scope projects and the consideration for potential provisional permits to <br />further reduce construction delays and permitting backlogs. <br />The only current code reference to temporary permits is for temporary structures in <br />Section 5-1-5 of the Hawaii County Code (2016 Edition, as amended). "Permit" means a <br />formal authorization issued by the authority having jurisdiction that authorizes <br />performance of specified work, pursuant to the construction code[.]" Must "formal <br />authorization" only mean a final permit? Why can't formal authorization also allow for <br />interim permitting under carefully stipulated rules? There are numerous architects, <br />engineers, designers, contractors with professional credentials or licenses whose <br />submittals are, with few exceptions, absent significant non-compliance with codes. Many <br />are already on the County's pre -qualified consultant list. Yet they are subject to the same <br />over -restrictive, detailed reviews as all other applicants. A responsible system where, <br />upon arrival of pre -qualified applicant submittals, the applications are reviewed for <br />completeness and cleared by Planning, then issued a provisional permit. <br />Conclusion: Having a conditional permitting process for qualified persons would greatly <br />expedite construction starts, save applicants money with faster completions, minimize <br />labor and materials cost increases, and provide many related benefits. Applicants would <br />assume all risks and penalties. They would still have to make adjustments/changes based <br />on County reviews throughout and until reviews are completed, with <br />construction/installation halted for significant health and safety issues. Such permits <br />would still be subject to code compliance and completion of plans review. Additionally, <br />consider time limitations and fee refunds when the permitting process is delayed. <br />The scope of the permit should be taken into consideration during review. Smaller scope <br />permits seem to be taking just as long, if not longer, than full new building permits. <br />Consider separating out permits into the different scopes to expedite approvals. For <br />example, have a foundation only permit so the contractor can start on the excavation and <br />footings, etc. Or separate out wall permits since those are typically done first. The risk <br />6 <br />2022 Cost of Govemment Commission —County of Hawai'i - Final Report <br />