My WebLink
|
Help
|
About
|
Sign Out
Home
2007-05-04 TPITTULO
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2007
>
2007-05-04 TPITTULO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 2:17:36 PM
Creation date
6/13/2011 2:17:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
commercial establishment or commercial use, then youve got to go through another process, <br />you would have go through another certificate of occupancy process. <br />PITTULLO:But it wouldnt stop the final for the single-family residence? <br />HAYASHI:Notifyou intend to use the property for single-family purposes. <br />PITTULLO:So as long as were using it for single-family residence purposeswe can <br />have the final on the existing structure, and the land itself can get rezoned to CN-20? Is that <br />accurate? <br />HAYASHI:Yeah. <br />PITTULLO:Okay, so I have no problem with that. Just as long as the wording says <br />thatiftheFireChief,FireInspectorokaysitandIcangetthefinalonthesingle-familyresidency <br />and not use it for commercial space until the appropriate time, thats fine. <br />YUEN:Well work on something that says that. But you have to understand that <br />you will get a final for your home as a home; and you will not be able to rent out office spaces <br />until you get a new building permit, plan approval, and certificate of occupancy. <br />ZELKO:Right. I think the main concern was getting the certificate of occupancy at <br />this time since it is going to be used as a residence for right now. <br />GRAHAM:Could you reread what your proposed condition is without the word future <br />for our benefit? <br />ZELKO:Sure. This is Condition C, In accordance with the Department of Water <br />Supplys Standards, the applicants shall extend a second 8-inch waterline along Ponahawai <br />Street from the existing 12-inch waterline within Komohana Street to obtain the 2,000 gpm fire <br />flow requirement or any alternative approved by the Fire Department prior to the receipt of a <br />Certificate of Occupancy. And maybe if its clear that he would be allowed to get that for a <br />single family dwelling, at least for now since hes only three weeks away. <br />GRAHAM:Jeff? <br />DARROW:Im sorry, in that description you just read, you left out for any <br />commercial use. You wanted to take that out as well? I believe all that theyre asking for is the <br />word future deleted. <br />ZELKO:Thats correct. <br />DARROW:So you want the remainder to stay in? <br />ZELKO:Yes. In fact, do you want me to read that again? <br />DARROW:No, no. Its just that that was -. <br />7EXHIBIT B <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.