My WebLink
|
Help
|
About
|
Sign Out
Home
2010-05-07 THU HONUA
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2010
>
2010-05-07 THU HONUA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 2:25:23 PM
Creation date
6/13/2011 2:25:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
to have people give us information to qualify them for standing. <br />all sorted out. Let me call up the next four people signed up fr <br />Barbara Hanog, Marcella St. Ambrogio and Kendra Tidwell. <br />All right, well, good afternoon. If I could get you all to raise <br />affirm to tell the truth today before the Windward Planning Comm <br />TESTIFIERS: I do. <br />WOODWARD: Very good. Okay, and weÓll start with Lorraine Mendoz <br />MENDOZA: Since you already said my name letÓs just do an echo. <br />WOODWARD: Okay, all right. If youÓll -. <br />MENDOZA: IÓm Lorraine Mendoza, PO Box 877, PepeÒekeo. <br />WOODWARD: Okay, you may begin. <br />MENDOZA: And IÓm speaking on behalf of the PepeÒekeo Community A <br />of the Commission; Aloha and good afternoon. Thank you for the <br />testimony on the subject of Hu Honua Bioenergy LLCÓs request for <br />Permit 221. <br />The PepeÒekeo Community Association has, in the past, hosted sev <br />representatives of Hu Honua Bioenergy LLC and the PepeÒekeo comm <br />these general meetings, the request by Hu Honua to meet with the <br />However, at our request, the agreement to hold meetings with the <br />the area was honored. With sincere intentions to remain inclusiv <br />impacted, the board members of the following associations of the <br />subsequently participated in meetings that followed: The PepeÒe <br />Association, The Orchards at Pepeeko and the Gardens at PepeÒeke <br />Concerns brought up at these and at the general meetings include <br />particles, road maintenance and associated costs, and the opposi <br />component. I commend the community at large, the associations, <br />participation in the dialogue. Requests to Hu Honua Bioenergy to <br />updates and status reports have been met. <br />Addressing the serious concern of no coal burning with this appl <br />221 is a huge relief to the members of this community. The on-g <br />existing power plant structure addresses the concerns of noise and emissions. We are aware of <br />conversations that have occurred between the associations, agenc <br />issues of road maintenance and related costs. <br />At present, Hu Honua Bioenergy has provided for the education and training of 4 members of <br />19 <br />EXHIBIT B <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.