My WebLink
|
Help
|
About
|
Sign Out
Home
2005-05-12 TCELLCO
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2005
>
2005-05-12 TCELLCO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 2:35:18 PM
Creation date
6/13/2011 2:35:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
have the Keaau-Pahoa Road. This direction towards Pahoa, this direction towards Keaau. The <br />location of this application would be from Keaau-Pahoa Road onto Orchidland, traveling right on <br />th <br />35 and its three lots in on the right side. <br />Referring to the site plan that has been submitted by the applicant. Theapplicant in this case is <br />Cellco Partnership doing business as Verizon Wireless. They are submitting a request for a <br />special permit to allow a 104-foot steel telecommunications tower, monopole, along with 12 <br />th <br />panel antennas and related equipment. On 35, which we have identified here, we have the <br />subject parcel which is a 2-acre parcel within the Orchidland Subdivision. The applicants are <br />proposing to utilize 1100 square feet of this 2-acre parcel identified in pink. The driveway to the <br />facility is identified in brown. Looking at more specifics, this is a blown-up shot that shows the <br />equipment area, the location of the tower and, more specifically, its not very easy to see but we <br />have a diagram of what the actual tower looks like. Its a monopole steel tower thats a 100 feet, <br />and then we have 23 of the panel antennas. Looking from a birds eye view it would be in a <br />circle; and these would be in sections of four panels each reaching out. <br />The reason for the request is Verizon Wireless has towers in Mt. View, Keaau, Pahoa. They <br />need to be able to connect their signal between Keaau and Pahoa. This site in Orchidland would <br />be ideal for being able to bring their coverage together in that area. <br />The Planning Director is recommending approval of this request. And the Planning Department <br />has received a petition for standing in a contested case from the Orchidland Community <br />Association. Are there any questions? <br />SPRINGER:Commissioners? <br />SIRACUSA:I have, I have a question -. <br />SPRINGER:Commissioner Siracusa. <br />SIRACUSA:Yeah,wereceivedsomethingfromJosephLipinskihere;andhestatesthat <br />cell towers are not shared by providers. Is that true? Is that accurate? <br />DARROW:Im sorry, I just received this correspondence that youre referring to. <br />Youreaskingifthecelltowersarenot,Imsorry-? <br />SIRACUSA:Hisstatementhereiscelltowerserviceisowned/providedbyasingle <br />wireless business and are NOT shared within the highly competitive industry, (i.e. one tower <br />does not serve all providers). So Im asking if that is true. <br />DARROW:Madam Chair, may I answer her? <br />SPRINGER:Commissioner Watanabe. <br />WATANABE:I know from experience thats not true. AT&T leases the same, you know, <br />same space from Verizon, because weve had situations like that where AT&T went down. <br />2EXHIBIT E <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.