Laserfiche WebLink
COMMISSIONERS: Good morning. <br />COTTLE: And welcome, Ms. Giffin. <br />GIFFIN: Thank you. <br />COTTLE: The first and second agenda items are related to Grace Community <br />Church, so IÓll be doing a combined presentation. But the Planning Commission will need to <br />vote separately on each item. So the first request is an amendment to Rezone 875, which <br />rezoned approximately 5 acres from Agricultural-5 acres to Residential and Agricultural-.5 acre. <br />And the Special Permit amendment is to Special Permit 1010, which allowed the establishment <br />of a church and related facilities on approximately 3 acres of that rezoned 5-acre parcel. <br /> <br />The property is located in the North Kona District off of Palani Road, just below Mmalahoa <br />Highway. This is Palani Road running in a kind of north-south direction. And the subject <br />property is outlined in red. <br /> <br />This is an aerial photograph showing Palani Road off to the left hand side, and the existing <br />church facilities are up in the top right corner, and a pastor residence is located right about where <br />the dot is. The neighboring parcel is occupied by the Kona Christian Academy, and they are <br />located right about here. <br /> <br />So more specifically, the amendment request is for a five-year t <br />Conditions C and D of the Change of Zone; Condition C is for a water commitment and <br />Condition D is for final subdivision approval. The Special Permit request is also a five-year time <br />extension to comply with Condition 2 for a water commitment and construction of the facilities, <br />the church facilities, is Condition 3. <br /> <br />So just to provide a little background on the project, one of th <br />Permit was to construct a left-turn lane on Palani Road at the project driveway. And also the <br />Change of Zone required that any traffic mitigation thatÓs required be constructed prior to <br />occupancy of any structure built on the rezoned property, which would include the church. So <br />for a variety of reasons, which are explained in more detail in the background report, the left-turn <br />lane has not been constructed yet. In late 2008 the Planning Department discovered that the <br />church was being occupied prior to the turn lane being completed. So the church and the County <br />met in late 2008 and came up with a solution; our Planning Director met with the church along <br />with Department of Public Works. And we issued a notice of violation letting the church know <br />that they cannot occupy prior to some items being completed, which are laid out in the October <br />letter from our Planning Director. <br /> <br />And I just want to kind of go over a few of the main items that the church has been working on <br />since 2008. One of the requirements was that they come in for a time extension to the Change of <br />Zone and the Special Permit, which they have done obviously, thatÓs why we are here. And <br />another item that they needed to complete was to execute a turn lane agreement with the County, <br />stating that they will construct the turn lane. There is a one-year time frame on that turn lane <br />agreement, which was executed on April 3, 2009, which means that the turn lane must be <br />constructed completely by April 3, 2010. There is a provision i <br />EXHIBIT A <br />2 <br /> <br />