Laserfiche WebLink
period of time. So we’ve been keeping track and trying to make our project consistent with <br />the CDP. <br />I think Chris Yuen mentioned the connectivity and, yeah, we’re showing the connectivity. <br />So we’re planning for the connectivity. There’s an emergency access that is on the top side <br />of the last, first cul-de-sac. That’s based on discussions we’ve had with the Public Works <br />about the need for emergency access so that -. Right now we don’t show a road connection <br />to Alii, the proposed Parkway; but we’re going to be designing that cul-de-sac so that <br />emergency vehicles and regular vehicles in the event of an emergency can also use that as an <br />access out of the property. And as was mentioned earlier we are working with the property <br />owner to the west, Metzler Group, and we have a written agreement for construction access <br />to Alii Drive, so none of the construction vehicles will go through. I think we’re very close <br />to getting agreement on a permanent access as well. So our first preference is to turn the Alii <br />Drive connection as the primary access to the project. And so, you know, while things are <br />not finalized on the permanent access I think we’re close to an agreement on that. And <br />we’ve been talking also to KIC about their plans in trying to make our plans of connectivity <br />related to theirs, and so that discussion is on-going right now. And I don’t know, Steve-? <br />LIM: Okay. I think you received this morning our letter transmitting our <br />proposed conditions of approval in red-line format. <br />ATTA: Oh, Steve -. <br />LIM: I’m sorry. <br />ATTA: One thing I forgot, yeah, this is a last-minute thing, I just forgot. On <br />the site plan at the entrance to Naniloa Drive, there had been concerns about open space and <br />park, and while our overall plan was to put our park -. You know, our original plan was to <br />do all of our park dedication on the mauka parcel, if possible, or to pay the park dedication <br />fee if we didn’t get the mauka rezoning. We have, we’ve been in discussion with some of the <br />community people over the last couple of days; and this morning we’ve decided to make a <br />commitment to convert this first parcel, it’s about 5,000 square feet, right at the entrance, and <br />turn that into a park with a tot lot on it. So that’s a change in our site plan that we’ve just <br />made; and we’ve made a commitment to do. So that will meet some of the park dedication <br />as well as some of the increase in the open space that this site plan represents. That’s an <br />additional part of our proposal right now. <br />LIM: I think what we’ll be proposing is a condition be added to the ones that <br />I’m going to be talking about right now, is there’s, relating to this recreational areas, <br />something to the effect that the applicant shall provide a recreational area of approximately <br />5,000 square feet at the Naniloa Street entry to the proposed subdivision which shall be <br />maintained by the Owners Association. Okay, moving on to the submittal that we made <br />today -. <br />SIRACUSA: Could, excuse me, could I ask a question before you move on? Is <br />that -? <br />EXHIBIT B <br />8 <br /> <br />