My WebLink
|
Help
|
About
|
Sign Out
Home
2010-06-04 T-MALOOF
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2010
>
2010-06-04 T-MALOOF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 3:26:40 PM
Creation date
6/13/2011 3:26:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The other issue is traffic. And thereÓs no doubt that Highway 130 is a traffic issue, and <br />particularly at peak times of the day. But it was created over a 50-year process; and solving that <br />problem is going to take a great amount of time. <br />Two points, the neighborhood center concept is actually part of the solution, not part of the <br />problem. ItÓs intended to be a way to keep traffic generating, and self-generating within the Puna <br />area, rather than coming and going from it. All, to my view, all of the neighborhood centers and <br />small commercial centers that are identified in the Puna CDP are served by intersections on <br />Highway 130 that are currently at the F level of service at peak morning and afternoon, all of <br />them, including the KeaÒau Transfer Station which is a, you know, a growing kind of public <br />community green business thatÓs right at that intersection. So using the Level F issue, and IÓm <br />not trying to discount that or the traffic accidents that are involved in that process but to saying <br />that that is your reason for not allowing these things to happen is taking one of the solutions out <br />of play, and that is the growth and expansion of these small commercial nodes providing <br />services. So if you want to wait for traffic to be solved before those kinds of centers exists or <br />allowed to grow and provide services, weÓre going to wait a long time behind the wide load, that <br />is DOT, that it takes to make them move those things along. <br />The second point is that Highway 130 improvements are real active conversations today. We <br />asked this Commission for sixty days additional time. We were originally scheduled sixty days <br />ago. And what we wanted to do was to get as good and current a look at the on-going work that <br />the Department of Transportation has done along Highway 130. Just a week or so ago they did <br />submit their draft Environmental Assessment for the entire corridor. So thatÓs 120 megabytes of <br />report. ItÓs a lot to dig into. After I finished reading it, there was a cartoon in the Tribune Herald <br />on Sunday about a guy with a blindfold on and a dart standing in front of a wheel that was, you <br />know, four-lane, three-lane, two-lane options for the Puna and they were kind of throwing darts <br />at it. And itÓs kind of like what I felt after I read it. It defines a lot of potential solutions, but <br />actually what happens will depend on availability of funds, on what the next, you know, kind of, <br />a whole series of issues. But what we do know is that the final Environmental Assessment has <br />been completed for the first step of the improvements, maybe the first major step of <br />improvements on Highway 130 in, I guess since the Phoa Bypass Road, no, the KeaÒau Bypass <br />Road. And that is the shoulder widening and the light at Shower. Our understanding is, from <br />conversations with the project managers at DOT, is that they will put the, theyÓre doing the last <br />bit of a plan prep, theyÓll go out to bid in October. They expect 15 to 18 months of construction <br />period of time, and would expect that the highway improvements, the widening of that shoulder <br />and putting a light at the Pohaku and Shower intersection, would be completed by about the <br />middle of 2012. What we see, what we think that will do is platoon traffic down the entire <br />corridor. It isnÓt going to solve all of these issues. Nothing will solve all of these issues, but it <br />will begin to do that. <br />And from BrooksÓs perspective, heÓs more than willing to wait until that light gets turned on to <br />take occupancy in this building. ThatÓs not something that heÓs saying, you know, heÓs going to <br />run out and do this and not care about the traffic. If thatÓs an issue, if this issue wants to be <br />addressed, it is being addressed in its first step; and heÓs willing to set that line apart. So thatÓs <br />an important issue. And I think with that I just kind of let it, let you folks throw questions at us. <br />I do appreciate TakaÓs concern about this GP/CDP issue, it is going to be an issue in the <br />13 <br />EXHIBIT A <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.