My WebLink
|
Help
|
About
|
Sign Out
Home
PD Recommendation Report (PL-SMA-2022-000025)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-05-04 Windward
>
Item #1 Hawaiian Ola Brewing Corp. (PL-SMA-2022-000025)
>
Board Packet from 2023-04-06 WPC Hearing
>
PD Recommendation Report (PL-SMA-2022-000025)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2023 2:20:00 PM
Creation date
4/11/2023 9:38:36 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
3/20/2023
Other Parcel Numbers
260150020000
Permit Number
PL-SMA-2022-000025
Parcel Number
260150010000
Description
PD Recommendation Report (PL-SMA-2022-025)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
13. Artificial light from exterior lighting fixtures, including, but not necessarily limited to <br /> floodlights, up-lights or spotlights used for decorative or aesthetic purposes shall be <br /> prohibited if the light directly illuminates, or is directed to project across property <br /> boundaries toward, the shoreline and ocean waters, except as may otherwise be permitted <br /> pursuant to Section 205A-71(b), Hawaii Revised Statutes. <br /> 14. All development generated runoff shall be disposed of on site and shall not be directed <br /> toward any adjacent properties. A drainage study shall be prepared by a professional civil <br /> engineer licensed in the State of Hawaii and submitted to the Department of Public Works <br /> prior to issuance of Final Plan Approval. Any recommended drainage improvements, if <br /> required, shall be constructed meeting with the approval of the Department of Public <br /> Works prior to receipt of a Certificate of Occupancy for any portion of the development. <br /> 15. A Solid Waste Management Plan shall be submitted to the Department of Environmental <br /> Management for review and approval prior to the issuance of Final Plan Approval. <br /> 16. Sewer lines shall be installed within the development to connect with the County's sewer <br /> system, meeting with the approval of the Department of Environmental Management, and <br /> prior to the issuance of a Certificate of Occupancy. <br /> 17. During construction,measures shall be taken to minimize the potential of both fugitive dust <br /> and runoff sedimentation. Such measures shall be in compliance with construction industry <br /> standards and practices utilized during construction projects of the State of Hawaii. <br /> 18. A National Pollutant Discharge Elimination System (NPDES)permit, if required, shall be <br /> secured from the State Department of Health before the commencement of construction <br /> activities. <br /> 19. In the event that surface or subsurface historic resources,including human skeletal remains, <br /> structural remains (e.g. rock walls,terraces,platforms, etc.), cultural deposits,marine shell <br /> concentrations, sand deposits, or sink holes are identified during the demolition and/or <br /> construction work, cease work in the immediate vicinity of the find, protect the find from <br /> additional disturbance and contact the State Historic Preservation Division at (808) 933- <br /> 7651. Subsequent work shall proceed upon an archaeological clearance from DLNR-SHPD <br /> when it finds that sufficient mitigation measures have been taken. <br /> -11- <br />
The URL can be used to link to this page
Your browser does not support the video tag.