My WebLink
|
Help
|
About
|
Sign Out
Home
PD Recommendation Report (PL-SMA-2022-000025)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-05-04 Windward
>
Item #1 Hawaiian Ola Brewing Corp. (PL-SMA-2022-000025)
>
Board Packet from 2023-04-06 WPC Hearing
>
PD Recommendation Report (PL-SMA-2022-000025)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2023 2:20:00 PM
Creation date
4/11/2023 9:38:36 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
3/20/2023
Other Parcel Numbers
260150020000
Permit Number
PL-SMA-2022-000025
Parcel Number
260150010000
Description
PD Recommendation Report (PL-SMA-2022-025)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
20. An annual progress report shall be submitted to the Planning Director prior to the <br /> anniversary date of the effective date of this permit. The report shall include, but not be <br /> limited to, the status of the development and to what extent the conditions of approval are <br /> being complied with. This condition shall remain in effect until all of the conditions of <br /> approval have been complied with and the Planning Director acknowledges that further <br /> reports are not required. <br /> 21. An initial extension of time for the performance of conditions within this permit may be <br /> granted by the Planning Director upon the following circumstances: <br /> A. The non-performance is the result of conditions that could not have been <br /> foreseen or are beyond the control of the applicant, successors or assigns, and <br /> that are not the result of their fault or negligence. <br /> B. Granting of the time extension would not be contrary to the General Plan or <br /> Zoning Code. <br /> C. The granting of the time extension would not be contrary to the original reasons <br /> for the granting of this permit. <br /> D. The time extension granted shall be for a period not to exceed the period <br /> originally granted for performance(i.e., a condition to be performed within one <br /> year may be extended for up to one additional year). <br /> E. If the applicant should require an additional extension of time, the Planning <br /> Department shall submit the applicant's request to the Planning Commission for <br /> appropriate action. <br /> 22. Should any of the foregoing conditions not be met or substantially complied with in a <br /> timely fashion, the Planning Director may initiate procedures to revoke the permit. <br /> -12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.