Laserfiche WebLink
some time to address impacts from tsunami (with the exception of <br /> locally generated tsunamis). <br /> As the site is not located adjacent to the shoreline and over 500 feet <br /> away, normal winter storm waters should not be an issue for this <br /> projeci_ <br /> G. Managing Development <br /> While this function is more applicable to the "authority" or approving <br /> agencies, the request is intended to operate within the confines of the <br /> existing Zoning Code. The subject site is zoned V-.75, and the <br /> principal use of the site is permitted. The request is merely to amend <br /> the terms of a parking area. In that regard, this project would be <br /> consistent with the policy of"us(ing), implement(ing), and enforc(ing) <br /> existing law effectively to the maximum extent possible in managing <br /> present and future coastal zone management." <br /> H. Public Participation <br /> There is a statewide public advisory body called Marine and Coastal <br /> Zone Management Advisory Group (MACZMAG) that has the task, <br /> among other matters, of advising the lead agency (Office of State Plan) <br /> on coastal management issues. This includes a direct or indirect <br /> review of certain requests that may have statewide coastal zone <br /> management implications. <br /> Public participation in the review of the permitting process is also <br /> achieved through the posting of a sign, as well as the use of sending <br /> notices to surrounding property owners of the submittal of an SMA <br /> application and another separate notice informing said owners of the <br /> date of the Leeward Planning Commission's required public hearing as <br /> well as the rights to request for participation via a contested case <br /> hearing. <br /> I. Beach Protection <br /> The subject property is not a coastal property and over 500 feet from <br /> the shoreline. As such, the policies and objectives relating to this <br /> matter do not apply. <br /> J. Marine Resources <br /> If deeded for the installation of the portable and self-operating control <br /> measures, mitigating erosion control measures can be taken to avoid <br /> any construction interface with the ocean. <br />