Laserfiche WebLink
Condition No. E is mandating that access shall be through Hualalai Vistas Subdivision. <br />However, Condition F says that if that mandate can€t happen, then there€s another option. <br />I€m concerned about that and, because shall‚ means shall.‚ And, in any case, there are <br />some problems with this proposed condition in my mind . Because it says in there about <br />midway through on the first page of it that The subdivision road shall be dedicated to the <br />County upon request.‚ Well, I would think that what should happen is that it should be <br />dedicated to the County within two years of approval of the zoning, or something of that <br />kind. I don€t want to leave it up to Public Works. I think it needs, there needs to be some <br />connection, some nexus, that€s the word I€m looking for, nexus, that says, if we grant you <br />this rezoning, this road is going to be built, it€s going to built in this time. And if you <br />don€t build it, you don€t have your rezoning; and, you know, your condition hasn€t been <br />met and, therefore, -. It says in Condition No. A, The Applicant and its successors or its <br />assigns shall be responsible for complying with all the stated conditions of approval.‚ So <br />you can€t do some of them, you€ve got to do all of them. <br />Now, with respect to this, there was a, and they have this dedicated. This road through <br />Mr.Smith€spropertybuilttoCountydedicablestandardsneedstobededicated.Yet,I <br />find in a letter from Mr. Fuke that they can€t really do that until the rezoning takes places. <br />It says, The road lot cannot be created now as it would result in having lots that would <br />be less than a minimum area called for by the present Ag-3a zoning.‚ So they can€t break <br />this out until after the zoning. Is that right, Mr. Yuen, because of the current zoning, <br />which is 3 acres, and there€s only 4.1-something, 4 point something? <br />YUEN:If it were, if it€s a County dedicated road, they could, because the <br />Subdivision Code does not apply to the creation of road lots and, so, the remnant, for the <br />remnant parcels resulting from the creation of a road. But as far as your prior request on <br />putting a time limit on Mr. Smith building the connector road, this -. Again, if Hualalai <br />Vistas does not develop a subdivision, then there€s no point in Mr. Smith building a <br />connector road to nowhere. If Hualalai Vistas develops a subdivision, either they or, and <br />they want to get finaled, then they have to build out to Church of God Road and connect. <br />If Mr. Smith is building at the same time and he, or earlier, then he has to do it. But in <br />either case, the timeframe is dependent, on the roads getting built is dependent upon the <br />development of Hualalai Vistas. <br />TYLER:Mr. Clever has to build a road over Mr. Smith€s property? <br />YUEN:We€re requiring that, yes. That€s a condition of the rezoning, that <br />they build a road out to Church of God and we had the power -. <br />TYLER:Right, over the southern part of his property but he doesn€t own <br />Mr. Smith€s property. <br />YUEN:No. Well, that€s why we€re requiring Mr. Smith to donate a right- <br />of-way for that road so that we can have a road built in a better location. <br />28 <br /> <br />