My WebLink
|
Help
|
About
|
Sign Out
Home
2005-07-15 GOLDING
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2005
>
2005-07-15 GOLDING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 8:30:27 AM
Creation date
6/14/2011 8:30:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPRINGER:Okay Commissioners were right up against 12 oclock. I see a number of <br />Commissioners would like to speak on this matter it looks like discussion will not conclude in <br />the next couple of minutes also taking into consideration that we have 3 members of the public <br />who have signed up to testify on this matter. What is the pleasure of the Commissioners? Are <br />any of you willing to take the Chairmanship on a temporary basis as a Chairman Pro tem to <br />conclude this discussion and move onto decision making? Commissioner Graham? <br />GRAHAM:Im certainly willing to take it on but I did want to indicate that I gotta <br />leave early today too so. I probably can stay till like 2:15 or something like that. <br />SPRINGER:Okay. Thank you Commissioner Graham. Commissioners I would like to <br />then make the appointment of Commissioner Graham. Hes indicated his willingness to serve <br />until 2:15 this afternoon. Are there any objections? <br />COMMISSIONERS:No. <br />SPRINGER:Thank you members. May we take another 5-minute recess while I just <br />turnmynotesovertotheCommissionerincludingthelistofpublictestifiers? <br />RECESSED:TheChaircalledforarecessat12:05p.m. <br />RECONVENED:The meeting reconvened at 12:16 p.m. <br />GRAHAM:I will call the Planning Commission meeting back to order. We are on the <br />agenda item of Gary and Crissy Golding for aSpecial Permit in the Kau district. Im William <br />Graham. Im going to be the temporary Chair ofthis meeting. And I wanted to let you all know <br />that Im certainly good till about 2:15 and we generally take a lunch break at some point. But a <br />lunch break would probably put almost an effective end on things so were going to run for a <br />little while and then if the Commissioners want to do different then Ill welcome hearing from <br />them.AndwhereCommissionerSpringerleftmeandmyunderstandingisthattherewere2of <br />our Commissioners here that had comments they wanted to make already pending and after that <br />Idliketogettothepublictestifierssincetheyvebeenheresolong.Andalwaysasapartofour <br />procedure after the public has testified the applicants get a chance to come back forward again <br />and make any responses to what came up in the public testimony. So were going to do that if <br />thats all right. Okay. Commissioner Watanabe were you pending a comment youd like to <br />make or a question? <br />WATANABE:Well I, actually I, how should I put this? I didnt realize we had 3 people <br />from the public that were willing to testify and I thought maybe we were getting to a point where <br />we might be able to entertain a motion. On the other hand right about that juncture they <br />indicated that Building M is not acceptable for the added flexibility the Director had suggested <br />with regard to the types of commercial activities that could occur there. And, in my mind I kind <br />of offered them a way out but it doesnt seem like any of the other buildings that are being <br />proposed are acceptable either for that type of activity or at least not in their minds. And you <br />know I think maybe we should hear the public testimony from those 3 individuals because they <br />EXHIBIT B <br />34 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.