My WebLink
|
Help
|
About
|
Sign Out
Home
2005-08-05 TMIRANDA01
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2005
>
2005-08-05 TMIRANDA01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 9:19:15 AM
Creation date
6/14/2011 9:19:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
for light industrial, such as Kawaihae and Garys Automotive area near the Waimea <br />Airport, have not been developed because of the cost of infrastructure. It would be better <br />to have businesses spend the money upgrading such sites rather than improving an <br />agricultural property. <br />Since our last hearing, weve received several correspondences. One is from Mr. Freddy <br />Rice; hopefully, you folks got a copy of that. If not, it is included in the submittal that <br />weve received today from the applicants representative, Attorney Robert Rodrigues; <br />and that is the second correspondence. It is in response to the Planning Directors <br />recommendation. Are there any questions? <br />GALDONES:Commissioners, any questions of Jeff? Commissioner Siracusa. <br />SIRACUSA:Yeah, okay, in the Background Report, page 4, No. 25, under <br />PUBLICSERVICESANDFACILITIES,Access,itsaysTheDepartmentofPublic <br />Works commented that access to the property is via Parcel 53, which is a private right-of- <br />way owned by Elwood Ramos. And I would like to know or if you can tell me if an <br />easement has been granted to the applicant by this Mr. Ramos? <br />DARROW:Yes, it has, Commissioner Siracusa. I believe that information is <br />made part of the record. <br />SIRACUSA:And how wide is this? <br />DARROW:Its a 60-foot right-of-way. As far as the pavement width, it varies. <br />There are some pictures that are, right here, Commissioner McCall, that are being passed <br />around that identify the different pavement widths there. Let me find that information <br />that youre requesting. Theres an Easement A document that has been submitted by the <br />applicant via fax, and this is dated 6/17/2005 and it identifies the easement for Parcel 55. <br />And I believe that additionally there was warranty deed which identifies, okay, Easement <br />A-.IfIcouldlookforthatinformationmorespecifically,thenIllbeabletobringthat <br />to your attention. I do have a copy of the warranty deed and I can go through that. But, <br />thee is the access easement that has been submitted with the -. <br />SIRACUSA:Okay, thank you. Ill take your word for that. I have another <br />question; and that is on that same page, the bottom of that page and the top of the next <br />which is A, it says that In addition, this use would be better located within an industrial <br />area. And Im wondering are there industrial areas within, say, that -. We usually look <br />at a 5-mile radius, dont we? Because we had come up with some things in the Waimea <br />area where there were no industrial zoned properties within a certain radius, and Im <br />wondering if there is an industrial area around there. <br />DARROW:The closest industrial area from this application that Im aware of <br />are the old camps; and I believe Paauhau camp had an industrial down below where <br />theres the existing site. Theres, unfortunately this map doesnt show those areas on <br />there; but there are specific areas that were relative to the camps that contain the <br />3EXHIBIT B <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.