Laserfiche WebLink
on. They purposely did not label the structures that were along the shoreline setback area that <br />sgdxlqdtrhmf+sg`ssgdxvhkkadconstructing new pollution entrapment structures as part of their <br />NPDES permit. Each time somebody uses a new etdk+xntlkkg`ud`mdvonkkts`ms-Sghrshld <br />hslrvnncbghor-Sgdxlqdfnhmfsng`ud`rgatssgdxlqdfnhmfsnhave woodchips also. That <br />qdpthqdrsghmjhmf+`mcsgdxlqdfnhmf to have logs rolling around. I have photos of logs on the <br />edge of the pali already. <br />The shoreline survey, because they did not admit they were doing construction in the shoreline <br />setback and that they needed to recon -, or to construct a new device where the old wooden <br />flume is, they misled the Planning Department on the shoreline survey issue. What the plot <br />plan complaint or letter that I wrote, which is the second item attached, I attached a map that <br />@B+hrhs@BHR+kdslrrdd+@BRH+oqnuhcdcoqdo+Hb`mlsqdmember their acronym, what it <br />means any more, but they were the ones who owned the rights to turn on the switch before Hu <br />Honua. On that application it has the top of pali. I made a list of all the things that are not on <br />the plot plan, but definitely a requirement is to put all the boundaries on, and the top of pali is <br />the boundary towards the makai side. This map shows that not only is their map different and <br />has less labels but the top of pali is really the hrrtd-Sgdxchcmlsotsnmsgdrgnqdkhmdrdsa`bj <br />line. <br />SgdxchcmlsotsnmsgdRs`sdK`mcTrdAntmc`qxKhmdvghbgvgdmsgdxcn,-Adb`trdsgdqdlr <br />an aerial photograph, a 1990 boundary interpretation from the LU <br />the makai side, leaving portions of the settlement pond in the Agricultural district. The PREP <br />v`rmls`akdsnfdssgdhqrnkhcwaste permit because they could not get a P-5 Form, which is the <br />pre-requisite for applying for a solid waste permit - because we told, because of years of <br />following up on this particular plant and showing that they were not complying with land use <br />k`vr-HmnsgdqvnqcrsgdxlqdcnhmfHmctrsqh`l activity on Agricultural land, which is not <br />authorized by 205-4 or the Zoning Code. <br />WOODWARD: Let me just interrupt you for a sebnmc-Vg`svdlqdgdqd for really is to <br />decide upon granting you status, not specifics -. <br />ROHR: The timing issue? <br />WOODWARD: Not specifics of the application itself. <br />QNGQ9Sghrhrmlssgdrodbhehbr-Hslr`antsshlhmf-Sgd`pplication must, I put on here each <br />of your rules regarding application, the applicant shall submit the following to the Director, a <br />plot plan of the property drawn to scale with all existing and proposed structures, and other <br />information necessary, to make a proper determination of the impacts relative to the specific <br />request. In here you have a letter that is just about that issud-HslrMn-1+`ss`bgldms-@mcH <br />wrote it out. I was in conversation with Daryn Arai from before the hearing, first hearing. <br />But, anyway, I had written it all out why that, vgxsgdxchcmlslddssg`sqdpthqdldms- <br />The application itself indicates wh`slrdwodbsdcsnadnmsg`splan, and it includes boundaries. <br />5 <br />EXHIBITC <br /> <br />