My WebLink
|
Help
|
About
|
Sign Out
Home
PD Background Report (PL-SPP-2023-000041)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-08-03 Windward
>
Item 1 Riaan Mattheus (PL-SPP-2023-000041)
>
PD Background Report (PL-SPP-2023-000041)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 10:49:25 AM
Creation date
7/28/2023 1:09:39 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
7/10/2023
Permit Number
PL-SPP-2023-000041
Parcel Number
160500580000
Description
PD Background Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
right outside my door to others who may have never had a fresh white <br />pineapple hand-picked and sliced up right before their eyes. This would <br />enable us to enhance the B&B experience for our guests. I am envisioning <br />producing enough fruit to supply, the household, guests and the local <br />markets in the future. <br />Accordingly, the requested use would further the agricultural objectives of <br />both the General Plan and Puna CDP. <br />D. County Zoning <br />The County zoning designation is Agriculture A-3a. The minimum lot size for this <br />zoning district is (3) acres. My property is 3 acres and considered a conforming <br />lot of record. The primary dwelling on my property is permitted. What is being <br />requested will not require any improvements to the property but only change of <br />its use to a B&B. While allowed in the Agriculture zone of the zoning Code, it is <br />not allowed in the State Land Use Agricultural District. As such, a Special Permit <br />is being required, which if approved would make the B&B use possible. <br />E. Special Management Area <br />My property falls outside the Special Management Area. No SMA permit is <br />required. A discussion of the project's relationship to the Coastal Management <br />policies, however, is Chapter VIII of this report. <br />F. Other Permitting Considerations <br />If there are any other permits required, we would adhere to the requirements. <br />V. INFRASTRUCTURAL CONSIDERATIONS <br />A. Water <br />We are self sufficient since we are set up with water catchment. We collect our <br />own rainwater and keep it in a 15,000 gallon water catchment tank. Our area <br />reflects an amount of 202 inches of average rainfall, which is more than <br />adequate to supply the property with water needs. <br />B. Wastewater <br />Our cesspool has been adequate for this house for the past 9 years, even while <br />doing hosted STVR. Whether we run a B&B or STVR, the wastewater demand <br />should remain the same. <br />
The URL can be used to link to this page
Your browser does not support the video tag.