My WebLink
|
Help
|
About
|
Sign Out
Home
PD RECOMMENDATION REPORT (PL-REZ-2022-000033)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-10-19 Leeward CANCELED
>
Item #1 Kona Three LLC (PL-REZ-2022-000033)
>
PD RECOMMENDATION REPORT (PL-REZ-2022-000033)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 2:58:37 PM
Creation date
10/9/2023 10:05:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The original change of zone ordinance was granted shortly thereafter in May 1984 <br /> to change the zoning district from Unplanned to RS-15 (Kona Vistas subdivision) and <br /> RM-5 (project site). That ordinance was amended several times over the years, the most <br /> recent of which came in 2002. <br /> The reasons for granting the original and latest change of zone ordinances have <br /> not changed. The project site has always been intended for a multiple-family housing <br /> development as the second increment of the overall development anticipated by the <br /> original change of zone and the proposed 450-unit, multiple-family development is <br /> consistent with this intent. Furthermore, as discussed below,the proposed development <br /> remains consistent with the General Plan and Zoning Code,whose designations have not <br /> changed since 2002. <br /> The applicant anticipates that they will be able to complete the entire project <br /> within ten (10)years of the approval of this amendment, as such the Deputy Director <br /> proposes new Condition G,which updates existing Condition I to allow for the additional <br /> ten (10)years with our standard plan approval requirement language. <br /> Appropriate infrastructure such as water,wastewater, and roadway access are <br /> available or will be constructed by the applicant to support the proposed 450-unit <br /> multiple family housing project. <br /> Conditions of approval will require the applicant to maintain the water <br /> commitments with the Department of Water Supply (DWS) for 450 water units secured <br /> to develop the proposed project, construct necessary water system improvements to <br /> provide potable water and fire suppression, and to provide anticipated water usage <br /> calculations to DWS prior to each phase of project development to ensure that total water <br /> usage will not exceed this allocation. Furthermore,the applicant will be required to <br /> construct new sewer infrastructure to extend and connect to the County sewer in the area. <br /> The applicant proposes to construct the following roadway facilities for the <br /> proposed project: <br /> 1) As represented in Figure 10 of the EA, Royal Vistas Roadway will be <br /> designed as a full-movement, channelized,two-way, stop-controlled, intersection with <br /> Queen Ka`ahumanu Highway. A condition of approval will require the applicant to <br /> secure approval from the State Department of Transportation (DOT) for the development <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.