My WebLink
|
Help
|
About
|
Sign Out
Home
2009-09-18 THUKOPA
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2009
>
2009-09-18 THUKOPA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 10:27:13 AM
Creation date
6/14/2011 10:27:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HOUSEL: Well, as a commissioner I feel very uncomfortable being asked to approve <br />something thatÓs undefined. <br />WATANABE: Uh huh. Any further discussion on that? Madam Director. <br /> <br />LEITHEAD TODD: Mr. HouselÓs concerns are typically addressed at subdivision and not at <br />rezoning. At subdivision the applicant comes in with their prel <br />going to create lots and where the roads are going to go, and then that map is sent out for <br />comment by all of the departments and we incorporate those comments including comments <br />from Department of Public Works in terms of the road alignment, sight distance and necessary <br />infrastructure as delineated, one, in the rezoning ordinance, and as required by the Subdivision <br />Code. Generally speaking, when somebody is coming in for entitlements, the reason you donÓt <br />see something set in stone is you donÓt go and hire the engineers and everybody else to do all of <br />that work, if you donÓt know whether you are going to have an entitlement to develop the <br />property, because thatÓs frankly from our property ownerÓs standpoint thatÓs pretty much <br />throwing money away because you donÓt know if you have a right to develop it. So typically <br />what happens in this process is that you have a conceptual plan that gives you kind of an idea of <br />what may or may not look like; but when it ultimately comes to t <br />approval, it may look different as already what they had initially envisioned is starting to change. <br /> <br />Maija, can you go back to the map of, where it shows Huallai? Yeah. If you look at that and <br />sight distance, if you are familiar with Huallai, the DPWÓs request to basically move the <br />entrance to the mauka portion of the land makes sense because wherever you are going to have <br />an entrance in or out and left and right turn lanes, you need to be looking at sight distance. And <br />given the piece of property, moving it to the far mauka corner makes the most sense in terms of <br />the sight distance. The difficulty that we sometimes have when we are looking at things is where <br />you site something may not be the ideal spot on Huallai Road. But we are not dealing with the <br />other properties; we donÓt have those other properties in front of us Î what we do have is this. <br />So given this particular application, the Public Works is trying to get it sited as best as they can <br />to try and take care of those issues of sight distance; but by moving it as far mauka as you ca <br />one hand it makes it difficult to line that up in any kind of a straight line to the existing stub-out <br />in Pualani, and given topography in this area, the applicantÓs problem is going to be putting in a <br />road that has the appropriate slope and grade, works in all the drainage features, and to meet <br />County dedicable standards. And so sometimes especially in Kona itÓs really hard to do straight <br />lines. You end up having to do something thatÓs a little bit more meandering in order to get the <br />requisite slope that you need so that you arenÓt basically redoing KaÒiminani Drive. And so there <br />are some unique issues and typically itÓs addressed at subdivision. I understand your concern <br />that itÓs kind of, well, is this what itÓs really going to look like. What you know is that there will <br />be a maximum of 53 lots, and that the size may vary because they <br />you have assurances from the conditions of the rezone that they have to build to a certain <br />standard, and you have assurances from the rezone that they have to build their intersection with <br />Huallai meeting with the requirements of the Department of Public Works as to sight distance <br />and requiring additional right-of-way so that we can preserve the ability to possibly improve <br />Huallai in the future. But if youÓve driven on Huallai, you know that it presents some very <br />difficult problems in terms of improving it partially Î sight distance, the way it curves, some of <br />the areas mauka of this the property drops off significantly from the road. And so I donÓt know <br />how much in the future Huallai because I think itÓll be a very expensive project especially the <br />EXHIBIT A <br />19 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.