Laserfiche WebLink
your core. And so if this is your core, and looking at this last master plan that’s already there by <br />virtual zoning and already been preliminarily negotiated by different users, you already have that <br />red area is identified as your Commercial Neighborhood Center – that’s already zoned. The other <br />area is referred to rental, affordable and just affordable homes in that area. Again, those properties <br />are already zoned. If you look at the property adjacent to the Kuakini Highway, and that’s on the <br />lower section, they already have preliminary arrangements to work with Innovations to have the <br />school over there, and that was also part of the zone change condition that the landowners had, as <br />they went through the zoning process for the creation of the commercial area. Then if you look on <br />the right side of that, basically the right side of that road would be generally over here, they are right <br />now working with the YMCA to get the YMCA situated over there first as having their existing <br />planned location along Ali‘i Drive. So what you see essentially right over here is the beginning of a <br />real hub; you have commercial areas zoned, you have planned residential areas, you have a school <br />coming up over here, you have possibly the YMCA over here. So then, if this is your core, the <br />surrounding area then becomes your secondary area, which includes Mr. Cook’s property, as well as <br />JKS. So then the question becomes what is the most appropriate use in the secondary area. To me, <br />I think that this plan here is the bull’s eye. It’s right here in the center. So you go back again to <br />what was presented – the core, secondary area and the other area. So we would maintain that you <br />already have the beginnings of well thought-out Neighborhood TOD concept over here – core, <br />secondary area which includes Mr. Cook’s and JKS property, and then the balance of the properties. <br />So now, we get to aside from the map portion and looking at the function, look at what the Planning <br />Director’s first recommendation called for in terms of concurrency, all the improvements that’s <br />required; if you go with the Director’s first recommendation, which you already have, one of the <br />requirements is that neither this project or this project here can get final subdivision approval until <br />this road here, which is nonexistent, is constructed – that fulfills the concept of concurrency because <br />they want to be able to facilitate the development of this core and have everybody kind of filling in, <br />notwithstanding the fact that you do have the Queen Ka‘ahumanu Highway extension bisecting a <br />portion of it, but nevertheless, this is the identified core, call it flexible or floating or whatever have <br />you. They only proceeded on the basis that this is the core and let’s work with it. So in terms of <br />from a land use standpoint, how do you address concurrency, specifically with the roadway <br />situation, is already embodied in the Planning Director’s initial recommendation. Connectivity, <br />connectivity is that this property here is not, these two properties here are not relying on like the <br />other subdivision before us, or another project before us, is not relying on any other private <br />development; it results in the extension of Ho‘omama Street, which already ends right over here, <br />and so they have direct access. But Ho‘omama Street up until here is only a 50-foot right-of-way. <br />But the intent on the Kona Community Development Plan calls for Ho‘omama Street to be extended <br />all the way through here and eventually connected to Kakalina Street, and this would be like one of <br />your mid-level, and this is your Huallai Road, so it would be kind of like, that kind of situation. So <br />once it hits Mr. Cook and JKS Partners’ property, the right-of-way within that area is not 50 feet; <br />they go 60 feet wide to accommodate more reasonably this north-south kind of connection. And <br />then again, they also have, like, this mauka-makai connection connecting also to this property here, <br />which is already previously zoned and it’s called Hu-Ko-Pa. So what you see on that last sheet, that <br />last sheet here, it shows you the core area, it shows where JKS Partners’ property is, it shows you <br />where Brian Cook’s property is, and it also shows you if and when Hu-Ko-Pa is developed, and the <br />property mauka of that area, how your roadway network would all, kind of like, intertwine. And <br />one of the things that’s very, it has been made painfully clear, too, is that this is not going to be a <br />gated community; because if it were a gated community, then it would frustrate the objectives of the <br />CDP in terms of achieving connectivity. The bottom line is multiple interpretations of the CDP and <br />Neighborhoods, you know, and by virtue of, like, Mr. Matsukawa coming in, Planning Director <br />5 <br />EXHIBIT C <br /> <br />