Laserfiche WebLink
RECENT AECOS,INC. PROJECTS <br /> Flora/Fauna,Water Quality, Stream & Marine Surveys <br /> 2014—present.New Kapalama Container Terminal Wharf and Dredging Project, <br /> Essential Fish Habitat Assessment & Coral Transplantation, Honolulu Harbor, <br /> Oahu, Hawaii. Department of Army File No. POH-2012-00081. AECOS No. <br /> 1354A-H. Daniel Lutz, Senior Project Manager, Moffatt & Nichol. (808) 533-7000. William <br /> Makanui,HMP Engineer,DOT,Harbors Division,Special Projects Group,(808) 586-2525 (Office), <br /> (808)291-0356(cell) <br /> Designed and conducted marine surveys (including benthic composition, coral size <br /> frequency distribution macro-invertebrate density, and fish diversity, size, density <br /> and biomass)to quantify marine resources in the proposed dredge and fill areas and <br /> other areas that may be impacted indirectly. Supported NOAA-NMFS, USFWS, <br /> and Department of Transportation consultations and consisted of a MSA, EFH <br /> assessment, ESA Section 7 consultation, DA permit and amendment preparation, <br /> coral transplantation plan, and implementation of long-term monitoring.Long-term <br /> monitoring was built into project scope. AECOS organized coordination and <br /> communication among HDOT Harbors and planning team. <br /> 2012 — 2021. Pier 12 and 15 Improvements, Coral Transplantation, Honolulu <br /> Harbor, Oahu, Hawaii. AECOS No. 1300A-H. Ben Ahakuelo, P.E., Construction <br /> Manager,Yogi Kwong Engineers,LLC,(808)942-0001 Mel Travens,DOT,Harbors Division,(808) <br /> 586-2461 (Office),(808)291-0851 (Mobile) <br /> Conducted surveys identifying and quantifying coral reef species for preparation of <br /> an EA and to assist in developing project alternatives and selecting a design with <br /> the least amount of impact to marine resources. Prepared a coral transplantation <br /> plan and worked with commercial divers to transplant corals. A post construction <br /> assessment was conducted immediately following completion of the project work <br /> at each pier, and a one-, three-, and five- year postconstruction assessment of <br /> transplanted corals was conducted. Long-term monitoring to evaluate success was <br /> built into project scope. <br /> 2021. A natural resources assessment of two sites at the Ellison Onizuka Kona <br /> International Airport, North Kona, Hawaii Island. AECOS No. 1671. <br /> Landrum&Brown(513) 530-1271 <br /> The State of Hawaii,Department of Transportation,Airports Division is proposing <br /> to make improvements on two sites that are currently undeveloped within the <br /> airport footprint. The northern site is approximately 75 ac in size and the southern <br /> AECOS, Inc. Statement of Qualifications <br /> Page 3 <br />