My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005632 06.30.23 HALEY & ALDRICH CAT PL.2, PL.4, PL.5, PL.13
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.02 - Botany
>
PL-INT-2023-005632 06.30.23 HALEY & ALDRICH CAT PL.2, PL.4, PL.5, PL.13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2023 3:23:01 PM
Creation date
7/5/2023 11:21:59 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/30/2023
Permit Number
PL-INT-2023-005632
Description
HALEY & ALDRICH, PROFESSIONAL SERVICES FOR CAT PL.2, PL.4, PL.5, PL.13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Example Projects Which Best Illustrated Proposed <br /> Team's Qualifications for This Contract <br /> (Present as many projects as requested by the agency,or 10 projects if not specified.Complete one Section F for each project) <br /> 20.EXAMPLE PROJECT KEY NUMBER 21.TITLE AND LOCATION(CITY AND STATE) 22.YEAR COMPLETED <br /> 3 Four Mile Creek Bridge Improvements(Bridge#22-7) <br /> Hawai'i, HI Professional Services Construction(if applicable) <br /> Ongoing <br /> 23.PROJECT OWNERS INFORMATION <br /> a.Project Owner b.Point of Contact Name c.Point of Contact Telephone Number <br /> CONSOR Engineers, LLC Ikaika Kincaid, Project Manager 451.6822 Ext.57501 <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(INCLUDE SCOPE,SIZE,AND COST) <br /> Project Cost: Start/Completion Dates: Client Quote or Other Relevant Data: <br /> $72,000 Ongoing <br /> Haley&Aldrich is providing geotechnical and environmental services to CONSOR Engineers for construction to improve an existing <br /> bridge maintained by the County of Hawaii, Department of Public Works.The Four Mile Creek Bridge is located immediately west of <br /> Hawai'i Belt Road on Kilauea Avenue just south of Haihai Street.The current bridge consists of a two-span reinforced concrete tee <br /> beam bridge.The south span is roughly 23'-6"and the north span is roughly 22'-6"with a total bridge length of about 53'-0". The <br /> superstructure is comprised of four reinforced concrete beams made of composite with a concrete deck. The overall width of the <br /> bridge is approximately 20'-6". <br /> x.71,J <br /> Geotechnical Investigation and Design Services * r ., <br /> » Preparation of a Project Assessment(Phase 1) > " `m7„,x <br /> » Assisting with final bridge design (Phase 2) t,',.;� a � <br /> 1` - <br /> » Performing post design services(Phase 3) -- 4 - - <br /> » Conducting a geophysical survey across the abutments and stream banks to determine if — �`J�I„' <br /> lava tubes or voids may be present within 20 feet of the ground surface and that may A_ - <br /> impact the design.The survey will consist of electrical resistivity tomography(ERT)and <br /> ground penetrating radar(GPR),which use electrical and electromagnetic signals to _.- 1 ' `); . <br /> detect geologic materials and anomalies underground to a depth of approximately 20 . <br /> feet. <br /> Environmental Services <br /> » Surveying efforts to designate the existing ROW and easements,and update mapping aspects <br /> » Biological survey efforts for nesting Hawaiian Hawks <br /> » Army Corps jurisdictional survey <br /> » Coordination with the Army Corps and preparation of permit applications for work in jurisdictional waters <br /> » Endangered Species Act Section 7 consultation <br /> » Preparation of a HEPA environmental assessment <br /> » Permitting Services, including: <br /> > Compliance with NEPA(National Environmental Policy Act)and associated statutory requirements <br /> > Biological/Environmental: Endangered Species Act,Fish and Wildlife Coordination Act,Magnuson-Stevens Fishery Conservation and <br /> Management Act,National Historic Preservation Act,Clean Air Act,Coastal Zone Management Act(Federal Consistency Determination), <br /> Clean Water Act(Section 404-Discharges in Waters of the U.S.Department of the Army permit,Section 402-National Pollutant Discharge <br /> Elimination System,Section 401-Water Quality Certification) <br /> > Historic Sites Review(Chapter 6e,HRS) <br /> > Stream Channel Alteration Permit(potential) <br /> > Special Management Area Permit(potential) <br /> > Conservation District Use Permit(potential) <br /> > Community Noise Control Permit(potential) <br /> > Work in County Right-of-Way(potential) <br /> > Grading,Grubbing,Excavating and Stockpiling Permits(potential) <br /> > Executive Order 12898-Environmental Justice,Executive Order 11988-Floodplain Management <br /> 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)Firm Name (2)Firm Location(City and State) (3)Role <br /> a Haley&Aldrich, Inc. Honolulu, HI Subconsultant:Geotechnical Services <br /> and Environmental Compliance <br /> STANDARD FORM 330(REV.8/2016) <br /> ICH <br />
The URL can be used to link to this page
Your browser does not support the video tag.