Laserfiche WebLink
F. Example Projects Which Best Illustrated Proposed <br /> Team's Qualifications for This Contract <br /> (Present as many projects as requested by the agency,or 10 projects if not specified.Complete one Section F for each project) <br /> 20.EXAMPLE PROJECT 21.TITLE AND LOCATION(CITY AND STATE) 22.YEAR COMPLETED <br /> KEY NUMBER <br /> 4 Geotechnical and Environmental Planning/Permitting Professional Services Construction(if applicable) <br /> Support,Hanalei National Wildlife Refuge River Intake 2022 2022 <br /> Repair, Kauai, HI <br /> 23.PROJECT OWNERS INFORMATION <br /> a.Project Owner b.Point of Contact Name c.Point of Contact Telephone Number <br /> U.S. Fish and Wildlife Service KPFF, Mark Wharry, PE 503.524.3860 <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(INCLUDE SCOPE,SIZE,AND COST) <br /> Project Cost: Start/Completion Dates: Client Quote or Other Relevant Data: <br /> $357K(Haley&Aldrich Fees) Ongoing since 2020 <br /> Haley&Aldrich provided geotechnical engineering and environmental consulting services for KPFF,the prime consultant providing <br /> preliminary engineering services for the US Fish and Wildlife Service(USFWS)at their Hanalei National Wildlife Refuge(NWR). USFWS <br /> utilizes a water intake on the Hanalei River to regulate water levels in the NWR,which consists of approximately 75 acres of wetland <br /> impoundments, 180 acres of taro patches,and 90 acres of wet pasture.The NWR is home to five endangered water birds. <br /> Scouring was evident at the intake location and river morphology .- �- � F <br /> may have been altered by recent heavy rain and flooding events. • — � 'No :�' � <br /> The USFWS requested a study to: ; •tal / • <br /> » Document the existing site conditions of the refuge's earthen •. d ! ;;: • I <br /> levee and main irrigation intake water control infrastructure .. <br /> (WCS). ., . <br /> » Present construction repair options to the intake and levee. .171 <br /> » Provide an engineering estimate of probable cost estimate for ,"t•.7 <br /> the identified repair options including relocation of the existing a; W _ <br /> WCS either upstream or downstream of the existing site. , <br /> Haley&Aldrich's tasks included: <br /> » Review of existing information and previous reports that may have information regarding intake. <br /> » Geotechnical inspection of the intake structure, including hand-auger borings in the levee. <br /> » Biological surveys,wetland delineation,and determination of the Ordinary High-Water Mark at the project site. <br /> » Evaluation of environmental and cultural clearances and permits likely to be required for the project, including discussing with <br /> KPFF potential design options and permits likely to be triggered by different options. <br /> » Preparation of a geotechnical memorandum based on results of our field visit and data review, providing our recommendations <br /> for embankment restoration and hardening. <br /> » Preparation of project permit applications and requests for approval, including Clean Water Act Section 404 consultation,Stream <br /> Channel Alteration Permit, NEPA CATEX documentation, Endangered Species Act Section 7 consultation;and National Historic <br /> Preservation Act Section 106 consultation. <br /> Haley&Aldrich provided construction support to the project by conducting inspections of the foundation system and testing, <br /> providing training on endangered species concerns,and reviewing and contractor's compliance with environmental requirements. <br /> 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)Firm Name (2)Firm Location(City and State) (3)Role <br /> Haley&Aldrich, Inc. Honolulu, HI Subconsultant: Geotechnical <br /> a <br /> Engineering, Environmental Permitting <br /> and Consulting <br /> STANDARD FORM 330(REV.8/2016) <br /> HREBI;ICH <br />