Laserfiche WebLink
I.rriFiscal Year 2023-2024 I PL.3) COMMUNITY PLANNING <br /> (Community Planning Assistant: Project Management Support,Community <br /> International Organizing, Public Participation, Meeting Facilitation) <br /> LIST OF REPRESENTATIVE RECENT PROJECTS <br /> Page 3 <br /> COMMUNITY PLANNING PROJECT EXPERIENCE <br /> Climate Change Adaptation Study <br /> Island of Oahu, Hawaii <br /> ,-.ren ir, ..;,.1,; 11-;r,;r,. <br /> DESIGN PRINCIPLES SSFM provided planning services for development of the County's <br /> FOR URBAN DEVELOPMENT TOD Climate Change Adaptation Guidelines including Data <br /> Collection and Outreach, and Infrastructure Planning. <br /> The purpose of this project was two-fold: 1) to outline design <br /> a •- principles that can be used to help develop policy and regulations for <br /> r <br /> a ' A property in Honolulu's transit-oriented development (TOD) and other <br /> ... ., urban areas that may be vulnerable to sea level rise (SLR) and other <br /> i climate change-related hazards; and 2)toprovide developers and <br /> yam• g p <br /> p r,.,,,_•. <br /> , „4,46„- '.. , <br /> �,� ,.. 1-11w, �. design professionals with preliminary guidance and information to <br /> .�° ,, consult when developing new project applications, or when <br /> .. considering adaptation options for existing projects. <br /> Estimated Construction Cost: $34,000 (fees) <br /> 145' Waiawa Correctional Facility Plan Review Use and Special Use <br /> Permits,Waipahu, Hawaii <br /> ""° SSFM prepared an Environmental Assessment, researched and <br /> completed the necessary requirements of applications for the Special <br /> Use Permit (SUP) and Plan Review Use (PRU) required to bring this <br /> Facility into compliance with the Land Use Ordinance (LUO). <br /> Cost: $334,534 (fees) <br /> Biological Control Containment Facility <br /> Various Locations, Hawaii <br /> SSFM provided a comprehensive planning document for a proposed <br /> new Department of Agriculture, Biological Control Containment <br /> Facility on Oahu. SSFM also prepared a project development report <br /> 1111 (PDR) and rough order of magnitude construction cost estimate. The <br /> R t .= PDR included Land Area Requirements, Building Area <br /> Requirements, and Applicable Regulations. It also included a Site <br /> _. List with available State-owned properties and Environmental <br /> permits and studies. <br /> Estimated Construction Cost: $90 million to $140 million <br /> Kamuela Vacuum Cooling Plant, Master Plan Feasibility Study, <br /> Air <br /> �+ Kamuela, Hawaii <br /> ` — _ .. SSFM provided planning and project management services for a <br /> t,, master plan study of an existing property in Kamuela that the client <br /> ,-eIIIIIowned and leased to a cooperative. SSFM provided <br /> I. recommendations to update the existing facility to meet the Food and <br /> Drug Administration's Food Safety Modernization Act (FSMA), as <br /> t <br /> well as explored expansion of the property to offer other amenities, <br /> r such as washing, packing, and processing of produce to encourage <br /> and promote farming. <br /> Cost: $100,000 (fees) <br />