Laserfiche WebLink
Fiscal Year 2023-2024 I PL.3) COMMUNITY PLANNING <br /> (Community Planning Assistant: Project Management Support,Community <br /> International Organizing, Public Participation, Meeting Facilitation) <br /> on.,«•i.D I keeo, I 5u610.e <br /> LIST OF REPRESENTATIVE RECENT PROJECTS <br /> Page 2 <br /> COMMUNITY PLANNING PROJECT EXPERIENCE <br /> F West Kauai Energy (fka Puu Opae Water) Project Environmental <br /> Assessment, Kokee-Kekaha, Kauai, Hawaii <br /> SSFM was the Prime Consultant responsible for the preparation of <br /> - an Environmental Assessment (EA) for this integrated renewable <br /> ° energy and irrigation project that would utilize state land and water <br /> for the following objectives: Renewable energy production via <br /> hydroelectric electric generation; and, renewable energy production <br /> 4via solar photovoltaic (PV) generation. <br /> Cost: $212,895 (fees) <br /> Farrington Highway Corridor Study <br /> `"" ° Waianae, Hawaii <br /> '"1 1f+° �-• ", <br /> • SSFM was the Prime Consultant for the planning and investigations <br /> that identified recommendations for ways to reduce congestion, <br /> r rye enhance capacity, and increase safety while improving resiliency <br /> § 40.140, ` r along 14 miles of the Farrington Highway corridor from the end of H- <br /> 1 in Kapolei to Makaha Beach Park. The study identified short and <br /> long term improvements needed to maintain the Farrington Highway <br /> corridor. <br /> Cost: $4974,959 (fees) <br /> FY18 Tinian Construction Capacity Study(TCCS) <br /> Tinian, Commonwealth of the Northern Mariana Islands (CNMI) <br /> SSFM provided a comprehensive analysis of the infrastructure and <br /> resources requirements to support Department of Defense <br /> 0 construction activities on the island of Tinian, CNMI. The project <br /> team developed a methodology to produce recommendations based <br /> on a systematic approach in analyzing resources and limitations to <br /> each technical discipline. The purpose of the TCCS was to assist <br /> = DoD in making informed planning and programming decisions for <br /> future DoD construction on Tinian. <br /> Cost: $1.23 million (fees) <br /> x _ <br />