Laserfiche WebLink
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Christopher L.Conger,Vice President Project Manager/Coastal Scientist a. TOTAL b. WITH THIS FIRM18 12 <br /> 15. FIRM NAME and LOCATION(City and State <br /> Sea Engineering,Inc. <br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION State and Discipline) <br /> M.Sc.,University of Hawaii-Manoa,Coastal Geology <br /> B.S.,University of Hawaii-Manoa,Geology and Geophysics <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS Publications,Organizations, Training,Awards,etc. <br /> 100 ton near shore Captains License,Navy Second Class Diver Certification,Commercial Diver Certification ADC Supervisor) <br /> 19. RELEVANT PROJECTS <br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED <br /> Scour Critical Bridges—Phase III Professional Services Construction <br /> Hawaii,Kauai,Maui,and Oahu 2021 to present n/a <br /> 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm <br /> a. The Hawaii Department of Transportation has inspected 19 bridges across the State that were identified as Scour Critical. Sea <br /> Engineering,Inc,has been contracted by KAI Hawaii in support of the Scour Critical Bridge project and will prepare,submit, <br /> and track the required permit applications for eight total bridges—Kapue,Weoweopilau,Maliko,Hakipuu,Kaalaea, <br /> Kaukonahau,and Paumalu. <br /> Cost: $534,995 Role:Project Manager <br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED <br /> Mauna Kea Shoreline Restoration Project Professional Services Construction <br /> Kohala Coast,Hawaii 2018 to present n/a <br /> 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm <br /> Sea Engineering has been contracted to conduct detailed oceanographic and shoreline investigations to support implementation <br /> b. of these improvements. Work tasks included: 1. Wave analysis including deepwater wave climate, extreme deepwater wave <br /> height,numerical wave modeling of wave transformation to shallow water,wave runup,analysis of a particular extreme wave <br /> event that resulted in backshore flooding,and sea level rise impacts.2.Site investigations including beach profile measurements, <br /> beach topographic survey, sand sampling and analysis, and assessment of coastal processes. 3. Development of a dune <br /> restoration plan. <br /> Cost: $81,800 Role:Project Manager <br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED <br /> Laupahoehoe Boat Ramp Repair Professional Services Construction <br /> Hawaii(Big Island) 2014 to present n/a <br /> 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm <br /> Laupahoehoe Park contains a boat launch ramp facility and protective,250-foot-long breakwater built in 1988.In the summer <br /> C. of 2009,the launch ramp was closed due to hazardous conditions,including erosion of deep grooves in the ramp surface,exposed <br /> reinforcing rebar,and loss of traction. Sea Engineering,Inc.(SEI)and Arnold T.Okubo&Associates were contracted by the <br /> County of Hawaii to investigate site conditions of the ramp,repairs to the ramp,prepare the necessary environmental and permit <br /> documents,and provide support through construction. <br /> Cost:200,000 Role:Project Manager <br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED <br /> Ka'anapali Beach Nourishment Professional Services Construction <br /> —Ka'anapali,Maui 2014 to 2023 n/a <br /> 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if promect performed with current firm <br /> d. Sea Engineering, Inc., was contracted by the Department of Land and Natural Resources to provide research, planning, <br /> permitting,and design services for the Ka'anapali Beach Restoration and Berm Enhancement project. The project consisted of <br /> restoring and enhancing the beaches along Ka'anapali shoreline to reduce or mitigate damage from erosion, and to increase <br /> available recreational beach. <br /> Cost: $792,200 Role:Project Manager,Coastal Scientist <br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED <br /> Hawaii DOT Scour Critical Bridge Project—Bathymetry&Underwater Professional Services Construction <br /> Inspection and Permitting 2017 n/a <br /> Hawaii Island,Kauai,&Oahu <br /> 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if promect performed with current firm <br /> e. The State Department of Transportation is assessing up to 27 bridges across the State for possible scour repairs.Sea Engineering <br /> completed bathymetry surveys and underwater inspections of 5 bridges, including Kolekole Bridge and Paheehee Bridge on <br /> Hawaii Island,Wailua River Bridge and Wailua River Plantation Bridge on Kauai,and the Waimea River Bridge on Oahu. SEI <br /> is also responsible for requiring permits for the repair work. <br /> Cost: $319,655 Role:Project Manger <br />