|
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> Christopher L.Conger,Vice President Project Manager/Coastal Scientist a. TOTAL b. WITH THIS FIRM18 12
<br /> 15. FIRM NAME and LOCATION(City and State
<br /> Sea Engineering,Inc.
<br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION State and Discipline)
<br /> M.Sc.,University of Hawaii-Manoa,Coastal Geology
<br /> B.S.,University of Hawaii-Manoa,Geology and Geophysics
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS Publications,Organizations, Training,Awards,etc.
<br /> 100 ton near shore Captains License,Navy Second Class Diver Certification,Commercial Diver Certification ADC Supervisor)
<br /> 19. RELEVANT PROJECTS
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Scour Critical Bridges—Phase III Professional Services Construction
<br /> Hawaii,Kauai,Maui,and Oahu 2021 to present n/a
<br /> 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
<br /> a. The Hawaii Department of Transportation has inspected 19 bridges across the State that were identified as Scour Critical. Sea
<br /> Engineering,Inc,has been contracted by KAI Hawaii in support of the Scour Critical Bridge project and will prepare,submit,
<br /> and track the required permit applications for eight total bridges—Kapue,Weoweopilau,Maliko,Hakipuu,Kaalaea,
<br /> Kaukonahau,and Paumalu.
<br /> Cost: $534,995 Role:Project Manager
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Mauna Kea Shoreline Restoration Project Professional Services Construction
<br /> Kohala Coast,Hawaii 2018 to present n/a
<br /> 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
<br /> Sea Engineering has been contracted to conduct detailed oceanographic and shoreline investigations to support implementation
<br /> b. of these improvements. Work tasks included: 1. Wave analysis including deepwater wave climate, extreme deepwater wave
<br /> height,numerical wave modeling of wave transformation to shallow water,wave runup,analysis of a particular extreme wave
<br /> event that resulted in backshore flooding,and sea level rise impacts.2.Site investigations including beach profile measurements,
<br /> beach topographic survey, sand sampling and analysis, and assessment of coastal processes. 3. Development of a dune
<br /> restoration plan.
<br /> Cost: $81,800 Role:Project Manager
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Laupahoehoe Boat Ramp Repair Professional Services Construction
<br /> Hawaii(Big Island) 2014 to present n/a
<br /> 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
<br /> Laupahoehoe Park contains a boat launch ramp facility and protective,250-foot-long breakwater built in 1988.In the summer
<br /> C. of 2009,the launch ramp was closed due to hazardous conditions,including erosion of deep grooves in the ramp surface,exposed
<br /> reinforcing rebar,and loss of traction. Sea Engineering,Inc.(SEI)and Arnold T.Okubo&Associates were contracted by the
<br /> County of Hawaii to investigate site conditions of the ramp,repairs to the ramp,prepare the necessary environmental and permit
<br /> documents,and provide support through construction.
<br /> Cost:200,000 Role:Project Manager
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Ka'anapali Beach Nourishment Professional Services Construction
<br /> —Ka'anapali,Maui 2014 to 2023 n/a
<br /> 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if promect performed with current firm
<br /> d. Sea Engineering, Inc., was contracted by the Department of Land and Natural Resources to provide research, planning,
<br /> permitting,and design services for the Ka'anapali Beach Restoration and Berm Enhancement project. The project consisted of
<br /> restoring and enhancing the beaches along Ka'anapali shoreline to reduce or mitigate damage from erosion, and to increase
<br /> available recreational beach.
<br /> Cost: $792,200 Role:Project Manager,Coastal Scientist
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Hawaii DOT Scour Critical Bridge Project—Bathymetry&Underwater Professional Services Construction
<br /> Inspection and Permitting 2017 n/a
<br /> Hawaii Island,Kauai,&Oahu
<br /> 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if promect performed with current firm
<br /> e. The State Department of Transportation is assessing up to 27 bridges across the State for possible scour repairs.Sea Engineering
<br /> completed bathymetry surveys and underwater inspections of 5 bridges, including Kolekole Bridge and Paheehee Bridge on
<br /> Hawaii Island,Wailua River Bridge and Wailua River Plantation Bridge on Kauai,and the Waimea River Bridge on Oahu. SEI
<br /> is also responsible for requiring permits for the repair work.
<br /> Cost: $319,655 Role:Project Manger
<br />
|