E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 1 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> FIRM
<br /> Marc Ericksen,Senior Executive Officer Project Manager 32 a. TOTAL b. WITH TH
<br /> 32
<br /> 15. FIRM NAME and LOCATION(City and State
<br /> Sea Engineering,Inc.
<br /> 16. EDUCATION(Degree and S ecialization 17. CURRENT PROFESSIONAL REGISTRATION State and Discipline)
<br /> M.S.Coastal Geology
<br /> B.S.Earth Sciences
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS Publications,Organizations, Training,Awards,etc.
<br /> Member—ASCE,NITS,ACECH,SAME,WEDA,WEF,ASBPA
<br /> Certified H dro a her—National Society of Professional Surve ors/H dro ra hic Society of America
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Laupahoehoe Biological Surveys and Environmental Support
<br /> Laupahoehoe,Hawaii 2020 to present n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> a. Sea Engineering,Inc.,has been contracted by Cardno GS for USACE to perform reconnaissance biological surveys of the marine
<br /> environment within and adjacent to the Laupahoehoe Harbor breakwater. Work tasks include generating habitat maps, conduct
<br /> quantitative surveys, develop a report presenting key findings and to provide qualitative information that characterizes
<br /> presence/absence and abundance of fish,macroalgae,and non-coral macroinvertebrates species.
<br /> Cost: $38,036 Role:Project Manager
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Laupahoehoe Boat Ramp Repair Professional Services Construction
<br /> Hawaii(Big Island 2014 to present n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> Laupahoehoe Park contains a boat launch ramp facility and protective,250-foot-long breakwater built in 1988.In the summer of
<br /> b. 2009,the launch ramp was closed due to hazardous conditions,including erosion of deep grooves in the ramp surface,exposed
<br /> reinforcing rebar, and loss of traction. Sea Engineering, Inc. (SEI) and Arnold T. Okubo &Associates were contracted by the
<br /> County of Hawaii to investigate site conditions of the ramp,repairs to the ramp,prepare the necessary environmental and permit
<br /> documents,and provide support through construction.
<br /> Cost:200,000 Role:Project Manager
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Hilo WWTP Outfall Inspection Professional Services Construction
<br /> Hilo,Hawaii 2018
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> �. Sea Engineering,Inc.(SEI)was contracted by the Hawaii County Wastewater Division to perform an underwater inspection of
<br /> the Hilo Wastewater Treatment Plant(WWTP)outfall. SEI performed inspections on the outfall in 1987, 1990,2001,2005,
<br /> 2011,and 2012 and again in September of 2018.The inspection was conducted by a five-man dive team using SCUBA and
<br /> covered the submerged length of the outfall.
<br /> Cost: $22,400 Role:Project Manager
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Hawaii DOT Scour Critical Bridge Project—Bathymetry&Underwater
<br /> Inspections,and Permitting 2016
<br /> Hawaii Island,Kauai,and Oahu
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> d. The State Department of Transportation is assessing up to 27 bridges across the State for possible scour repairs. Sea Engineering
<br /> completed bathymetry surveys and underwater inspections of 5 bridges, including Kolekole Bridge and Paheehee Bridge on
<br /> Hawaii Island,Wailua River Bridge and Wailua River Plantation Bridge on Kauai,and the Waimea River Bridge on Oahu.SEI is
<br /> also responsible for requiring permits for the repair work.
<br /> Cost: $319,655 Role:Project Manager.
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Post—Storm Hydrographic Survey of Hilo Harbor
<br /> Island of Hawaii 2015
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> e. Tropical Storm Iselle hit the east side of Hawaii Island on August 7, 2014. Concerns that the Hilo Harbor channel would be
<br /> compromised by sunken debris or other obstructions due to the effects of the storm,SEI was contracted by AECOM/USACOE to
<br /> provide a hydrographic survey to verify that the channel was clear of obstacles.Two survey engineers completed the survey mid-
<br /> morning the day after the storm, and the results were communicated to the USACOE_POH. The Harbor was immediately re-
<br /> opened.
<br /> Cost: $25,911 Role:Project En ineer/H dro a her
<br />
|