|
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> Morgan Stephenson Coastal Engineer a. TOTAL b. WITH THIS FIRM12 12
<br /> 15. FIRM NAME and LOCATION(City and State
<br /> Sea Engineering,Inc.
<br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION State and Discipline)
<br /> M.S.Coastal Engineering
<br /> M.S.Civil Engineering
<br /> B.S.Civil Engineering
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS Publications, Oi anizations, Training,Awards,etc.
<br /> Member—ASCE
<br /> 19. RELEVANT PROJECTS
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Laupahoehoe Harbor Repair Design Professional Services Construction
<br /> Lau ahoehoe,Hawaii 2020 to present n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> In 2019, USACE retained the services of Nagamine Okawa Engineers, Inc. and Sea Engineering, Inc. (SEI) to evaluate the
<br /> a. condition of the existing breakwater, develop and compare alternative repair plans, and develop conceptual repair plans and
<br /> rough order of magnitude construction costs under the U.S. Army Corps of Engineers (USACE)Operations& Maintenance
<br /> (O&M)program. In 2020,USACE retained the services of Cardno GS,Inc.,and SEI to develop the repair plan through final
<br /> design.
<br /> Cost:$141,640 Role:Coastal Engineer
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Pohoiki Boat Ramp Repair Relocation Study Professional Services Construction
<br /> Puna,Hawaii 2019 to present n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> b. Sea Engineering was contracted by the Department of Land&Natural Resources—DBOR to provide coastal engineering and
<br /> environmental permitting services to determine the scope of work,environmental permitting requirements,and cost estimates
<br /> to repair and improve the Pohoiki Boat Ramp facility located along the southeast coast of Hawaii Island.
<br /> Cost: $42,960 Role: Coastal Engineer
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Kalepa Revetment and Seawall Repair Professional Services Construction
<br /> Kalepa,Maui 2016 to present n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> Sea Engineering,Inc.(SEI)was contracted by the County of Maui,Department of Public Works to provide the design and
<br /> C. permitting of shore and road protection along an approximate 450-ft reach of the Piilani Highway at the Kalepa headland.
<br /> Work included:Topographic survey,planning and permitting,project permits,and project design.Design elements include
<br /> the shore protection revetment,shore protection seawall/retaining wall,roadway improvements(asphalt paving and guardrail
<br /> installation),and additional bank stabilization and possible shore protection.
<br /> Cost: $461,872 Role:Coastal Engineer
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Kalaeloa Harbor Channel&Basin Hydrographic Survey Professional Services Construction
<br /> Kalaeloa Harbor,Oahu 2019 n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> d. Sea Engineering,Inc(SEI)was contracted by Control Point Surveying for HDOT Harbors Division to provide a Multibeam
<br /> hydrographic Survey of the channel and basin areas of Kalaeloa Barbers Point Harbor.Project deliverables included an xyz
<br /> file of the bathymetry data and a color-coded DEM.
<br /> Cost: $20,300 Role:Coastal Engineer/Hydrographic Surveyor
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Kahului Harbor Pier 2 High Spot Hydrographic Survey Professional Services Construction
<br /> Kahului Harbor,Maui 2018 n/a
<br /> 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
<br /> e. Sea Engineering,Inc(SEI)was contracted by Control Point Surveying for HDOT Harbors Division to provide a hydrographic
<br /> survey of a high spot in the Pier 2 vicinity of Kahului Harbor.Project deliverables included a xyz spreadsheet of bathymetry
<br /> data.
<br /> Cost: $26,200 Role:Coastal Engineer/Hydrographic Surveyor
<br />
|