E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> Scott P.Sullivan,Senior Coastal Engineer Project Manager/Coastal a. TOTAL b. WITH FIRM
<br /> Engineer 50 50
<br /> 15. FIRM NAME and LOCATION(City and State
<br /> Sea Engineering,Inc.
<br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION State and Discipline)
<br /> M.S.Ocean Engineering
<br /> B.S.Mechanical Engineering
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS Publications,Organizations, Training,Awards,etc.
<br /> 19. RELEVANT PROJECTS
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Pohoiki Boat Ramp Repair Relocation Study Professional Services Construction
<br /> Puna District,Hawaii 2019 to present
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current
<br /> a. firm
<br /> Sea Engineering was contracted by the Department of Land&Natural Resources—DBOR to provide coastal engineering and
<br /> environmental permitting services to determine the scope of work,environmental permitting requirements and cost estimates to
<br /> repair or replace the Pohoiki Boat Ramp facility located along the southeast coast of Hawaii Island.
<br /> Cost: $42,960 Role:Project Manager/Coastal Engineer
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Waikoloa Beach Management Plan Professional Services Construction
<br /> Waikoloa,Hawaii 2017 to present
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current
<br /> fi rm
<br /> During a tsunami in March 2011 the beach at Anahoomalu Bay was severely eroded,a 200-foot-wide breach was created through
<br /> the beach into the fishpond depositing sand in the pond,and much of the fishpond rock wall which acted as a backstop for the
<br /> b. beach was destroyed. Following completion of repairs,the beach has been relatively stable.To ensure the continued stability of
<br /> their beach, and address concerns about sea level rise, the Waikoloa Land Company and Waikoloa Beach Association have
<br /> contracted Sea Engineering to develop a long-term plan for management and maintenance of their valuable beach resource.Work
<br /> includes beach change monitoring, coastal assessment and preliminary concept plan, offshore sand survey, development of a
<br /> detailed beach maintenance/management plan, environmental assessment and permit application, and detailed design and
<br /> construction documents.
<br /> Cost: $12,560 Role:Project Manager
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Waikiki Beach Restoration Professional Services Construction
<br /> Honolulu,Hawaii 2016 to present
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current
<br /> C. firm
<br /> Sea Engineering,Inc.,under contract to the State of Hawaii,Department of Land and Natural Resources in support of
<br /> developing a more stable,resilient,and sustainable beach configuration in Waikiki.The general scope of work includes a
<br /> feasibility study,environmental impact statement and conceptual design and permitting for beach improvements.
<br /> Cost: $799,300 Role:Project Manager/Coastal Engineer
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Anaehoomalu Bay Tsunami Damage Repair Professional Services Construction
<br /> Anaehoomalu,Waikoloa,South Kohala,Hawaii 2016
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current
<br /> firm
<br /> d Sea Engineering was contracted to obtain permits and do emergency repair work to Waikoloa Beach and the historical fishpond
<br /> that was severely damaged by the 2011 tsunami.A sand-filled geotextile tube barrier was installed to close the gap in the beach.
<br /> The emergency repair work was accomplished as an intermediate step to protect the fishpond while a long-term, permanent
<br /> repair/restoration plan for the pond and beach can be developed. Permanent repairs include rebuilding the fishpond wall and
<br /> restoration of the beach to its pre-tsunami condition.
<br /> Cost:235,000 Role:Project Manager
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Keauhou Bay Offshore Mooring Design Professional Services Construction
<br /> Keauhou Bay,North Shore,Island of Hawaii 2013
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current
<br /> e. firm
<br /> Sea Engineering was contracted by the Department of Land and Natural Resources (DLNR) to design offshore moorings for
<br /> small boats in Keauhou Bay,Hawaii.The project required field site investigations,design of a gravity anchor system suitable for
<br /> the rocky cobble substrate,design of a layout to maximize boat mooring capacity and Department of the Army permit acquisition.
<br /> Cost: $70,000 Role:Project Manager