Laserfiche WebLink
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Scott P.Sullivan,Senior Coastal Engineer Project Manager/Coastal a. TOTAL b. WITH FIRM <br /> Engineer 50 50 <br /> 15. FIRM NAME and LOCATION(City and State <br /> Sea Engineering,Inc. <br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION State and Discipline) <br /> M.S.Ocean Engineering <br /> B.S.Mechanical Engineering <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS Publications,Organizations, Training,Awards,etc. <br /> 19. RELEVANT PROJECTS <br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED <br /> Pohoiki Boat Ramp Repair Relocation Study Professional Services Construction <br /> Puna District,Hawaii 2019 to present <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current <br /> a. firm <br /> Sea Engineering was contracted by the Department of Land&Natural Resources—DBOR to provide coastal engineering and <br /> environmental permitting services to determine the scope of work,environmental permitting requirements and cost estimates to <br /> repair or replace the Pohoiki Boat Ramp facility located along the southeast coast of Hawaii Island. <br /> Cost: $42,960 Role:Project Manager/Coastal Engineer <br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED <br /> Waikoloa Beach Management Plan Professional Services Construction <br /> Waikoloa,Hawaii 2017 to present <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current <br /> fi rm <br /> During a tsunami in March 2011 the beach at Anahoomalu Bay was severely eroded,a 200-foot-wide breach was created through <br /> the beach into the fishpond depositing sand in the pond,and much of the fishpond rock wall which acted as a backstop for the <br /> b. beach was destroyed. Following completion of repairs,the beach has been relatively stable.To ensure the continued stability of <br /> their beach, and address concerns about sea level rise, the Waikoloa Land Company and Waikoloa Beach Association have <br /> contracted Sea Engineering to develop a long-term plan for management and maintenance of their valuable beach resource.Work <br /> includes beach change monitoring, coastal assessment and preliminary concept plan, offshore sand survey, development of a <br /> detailed beach maintenance/management plan, environmental assessment and permit application, and detailed design and <br /> construction documents. <br /> Cost: $12,560 Role:Project Manager <br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED <br /> Waikiki Beach Restoration Professional Services Construction <br /> Honolulu,Hawaii 2016 to present <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current <br /> C. firm <br /> Sea Engineering,Inc.,under contract to the State of Hawaii,Department of Land and Natural Resources in support of <br /> developing a more stable,resilient,and sustainable beach configuration in Waikiki.The general scope of work includes a <br /> feasibility study,environmental impact statement and conceptual design and permitting for beach improvements. <br /> Cost: $799,300 Role:Project Manager/Coastal Engineer <br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED <br /> Anaehoomalu Bay Tsunami Damage Repair Professional Services Construction <br /> Anaehoomalu,Waikoloa,South Kohala,Hawaii 2016 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current <br /> firm <br /> d Sea Engineering was contracted to obtain permits and do emergency repair work to Waikoloa Beach and the historical fishpond <br /> that was severely damaged by the 2011 tsunami.A sand-filled geotextile tube barrier was installed to close the gap in the beach. <br /> The emergency repair work was accomplished as an intermediate step to protect the fishpond while a long-term, permanent <br /> repair/restoration plan for the pond and beach can be developed. Permanent repairs include rebuilding the fishpond wall and <br /> restoration of the beach to its pre-tsunami condition. <br /> Cost:235,000 Role:Project Manager <br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED <br /> Keauhou Bay Offshore Mooring Design Professional Services Construction <br /> Keauhou Bay,North Shore,Island of Hawaii 2013 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current <br /> e. firm <br /> Sea Engineering was contracted by the Department of Land and Natural Resources (DLNR) to design offshore moorings for <br /> small boats in Keauhou Bay,Hawaii.The project required field site investigations,design of a gravity anchor system suitable for <br /> the rocky cobble substrate,design of a layout to maximize boat mooring capacity and Department of the Army permit acquisition. <br /> Cost: $70,000 Role:Project Manager <br />