E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT Z t
<br />(Complete one Section E for each key person.) cillaE.$Ajt
<br />12. NAME
<br />Catherine Hanna, EIT
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Oceanit Laboratories. Inc.. Honolulu. Hawai'i
<br />13. ROLE IN THIS CONTRACT
<br />Civil Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />9 3
<br />"Ib. tuUL;A I IUN (uegree ana specianzaiion) 'I /. UUNNtN I NKUt-tssIUNAL NtUls I NA I IUN (state ana uiscipune)
<br />MS Civil and Environmental Engineering / 2012 Engineer in Training, New York, No. 088183
<br />BS Civil Enaineerina / 2011
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Certifications: OSHA 10-Hour Training #36-005323436 (2015), OSHA Asbestos Awareness Training #1360 (2021), AHA
<br />Heartsaver First Aid CPR & AED (2021)
<br />Awards: Charles Lee Crandall Award Winner (2010 & 2011), Margaret Arronet Corbin Award Winner (2011), Intel
<br />Foundation Research Grant Recipient (2011)
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Water Infiltration into Basement of International Arrivals Building
<br />Honolulu, O'ahu, Hawai'i
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />a.
<br />Project Engineer. Prepared book specifications for and provided detailing of improvements intended to stop water infiltration
<br />into the north and south portions of the Daniel K. Inouye International Airport basement. Researched specialty products and
<br />collaborated with manufacturers, distributors and local contractors to determine product suitability. Coordinated details with
<br />structural engineering consultant, SLSH.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />I
<br />CONSTRUCTION (If applicable)
<br />State Irrigation System Reservoir Safety Improvements
<br />Waimea, Big Island, Hawai'i
<br />Ongoing
<br />b.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer. Civil design and detailing of 40 linear feet of subgrade outlet pipe extension, new concrete intake box at the
<br />base, and new valve and valve stem system along the slope of Pu'ukapu Reservoir.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Kahana Bay Erosion Mitigation
<br />Lahaina, Maui, Hawai'i
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE MCheck if project performed with current firm
<br />C.
<br />Project Engineer. Prepared conceptual plans and details using Civil 3D for the four (4) alternatives considered in the project's
<br />Environmental Impact Statement (EIS), intended to develop a sustainable and resilient approach to mitigate regional erosion
<br />along 3,700 linear feet of Kahana shoreline. Developed quantity take -offs for each alternative for cost estimating purposes.
<br />Contributed to preparation of written content for EIS publication.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Mantokuji Mission Shoreline Adaption
<br />P5'ia, Maui, Hawai'i
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer. Prepared specifications and RFP package for an emergency temporary protection structure, consisting of
<br />d'
<br />imported, beach -compatible sand wrapped in geotextile fabric, along 112 linear feet of shoreline fronting the historic temple
<br />structure. Coordinated permitting efforts with regulatory agencies, and provided construction administration, including reviewing
<br />submittals and responding to RFIs. Prepared preliminary plans and design for the restoration of the sandy beach in Mantokuji
<br />Bay, as a permanent solution to the erosion and consequent threat to the temple, to help facilitate discussions with the
<br />community and regulatory agencies.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Ko'a Kea Resort Shoreline Protection
<br />K61oa, Kaua'i, Hawai'i
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer. Performed site reconnaissance, involving a site visit and local shoreline recession data collection. Prepared
<br />e.
<br />an engineering assessment of the beach and shoreline erosion at the property, assessed adaption options considering cost,
<br />constructability, and permitting implications, and developed conceptual plans and details for 165 linear feet of restored beach
<br />fronting the resort to reduce risks to public safety and natural resources from shoreline recession. Also developed conceptual
<br />plan for comprehensive small-scale beach restoration spanning seven (7) properties along 1,600 linear feet of Kiahuna Beach
<br />to incite collaborative discussions between owners.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Dale Residence Emergency Temporary Shoreline Protection
<br />Ka a'a, Kaua'i, Hawai'i
<br />Ongoing
<br />f'
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer. Drafted construction drawings and prepared specifications and other contract documents for 77 linear feet of
<br />temporary erosion control structure makai of the existing oceanfront erosion escarpment.