Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) C®G-ge,a►7it <br />12. NAME <br />Jason Y. Lee, P.E. <br />15. FIRM NAME AND LOCATION (City and State) <br />Oceanit Laboratories. Inc. Honolulu. Hawai'i <br />13. ROLE IN THIS CONTRACT <br />Senior Civil Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />24 1 2 <br />"Ib. tuUL;A I IUN (uegree ana Specianzaiion) '1 /. UUNNtN I F'KUt-tSSIUNAL NtUlo I NA I IUN (State ana uiscipune) <br />BS Civil Engineering / 1996 Hawaii, Civil Engineering, No. 13669 <br />Nevada, Civil Engineering, No.15275 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Certified Erosion and Sediment Control Plan Coordinator <br />Computer Skills: AutoCAD, ArcGIS, HEC-1, HEC-2, HEC-RAS, Flo-2D, WSPGW, FlowMaster, CulvertMaster <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Waikiki Aquarium Effluent Discharge System Upgrade <br />Honolulu, Hawaii <br />2023 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑� Check if project performed with current firm <br />a' <br />Senior Civil Engineer. Evaluated and designed upgrades for the aquatic life exhibit effluent disposal system to <br />meet the NPDES regulatory requirements. Served the role of Project Manager and Technical Lead of the Design <br />Team for the preparation of construction plans, specifications, and cost estimates. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Saddle Road — West Side Mamalahoa Hwy (SR 190) to MP 41 (Daniel k. <br />Inouye Hwy) <br />2010 <br />Island of Hawai'i, Hawai'i <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />b' <br />Senior Engineer. This project was a 10-mile new alignment bypass of the old Saddle Rd. on the Big Island of <br />Hawai'i. The project was performed for the Federal Hwy Administration, the Central Federal Lands Hwy Division, <br />and HDOT-Hwy Division. Responsibilities: Performed hydrologic and hydraulic analyses and recommended <br />drainage improvements to be included in the Preliminary Design Plans. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />Honolulu Rail Transit (East Kapolei to Aloha Stadium) <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Honolulu, Hawaii <br />2010 <br />I <br />C. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />Senior Engineer. Performed hydraulic and scour analysis of the rail columns at the channel/stream crossings <br />near the junction of H2 and Farrington Hwy and near the intersection of Kualakai Pkwy and Hoomohala Ave. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Lone Mountain/Beltway Detention Basins and Gowan Beltway Chnl <br />Clark County, Nevada <br />2008 <br />I <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />Senior Engineer. This project consisted of 600 acre-feet dual detention basins connected by a balance conduit <br />with a dual level of outfall flow control & a number of inflow storm drains and channels, including a 2-mile inflow <br />d. <br />channel that conveys up to 3800 cfs. Responsibilities: Performed hydrologic analyses for a drainage area over 10 <br />sq. mi.; coordinated with another engineering firm in reconciling the hydrology of the project with that of the Las <br />Vegas Valley 2008 Master Plan Update; performed hydraulic analyses and design of the drainage facilities that <br />included dual detention basins, emergency spillways, balance conduit, dual level outfall orifices, stepped spillway <br />channels, inflow storm drains and channels with energy dissipaters; prepared design report; QA/QC of plans and <br />specifications <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Gowan Outfall Lone Mountain Branch — Rancho to Decatur <br />Las Vegas, Nevada <br />2008 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />Senior Engineer. This project was a 2.2-mile storm drain system that consisted of RCBs ranging from 6-ft X 6-ft to <br />14-ft X 7-ft and conveyed up to 1600 cfs. Responsibilities: Performed hydraulic analyses and design of the 2.2- <br />e. <br />mile RCB storm drain system that includes the mainline, laterals, and drop inlets; reviewed drawings and plans <br />for quality control and quality assurance; prepared 30%, 70%, 90%, and final hydraulic design reports; identified <br />and resolved <br />utility conflicts; coordinated with City of Las Vegas, Clark County Regional Flood Control, and Nevada Department <br />of Transportation <br />STANDARD FORM 330 ( REV. 7/2021) PAGE 1 <br />