E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.) C®G-ge,a►7it
<br />12. NAME
<br />Jason Y. Lee, P.E.
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Oceanit Laboratories. Inc. Honolulu. Hawai'i
<br />13. ROLE IN THIS CONTRACT
<br />Senior Civil Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />24 1 2
<br />"Ib. tuUL;A I IUN (uegree ana Specianzaiion) '1 /. UUNNtN I F'KUt-tSSIUNAL NtUlo I NA I IUN (State ana uiscipune)
<br />BS Civil Engineering / 1996 Hawaii, Civil Engineering, No. 13669
<br />Nevada, Civil Engineering, No.15275
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Certified Erosion and Sediment Control Plan Coordinator
<br />Computer Skills: AutoCAD, ArcGIS, HEC-1, HEC-2, HEC-RAS, Flo-2D, WSPGW, FlowMaster, CulvertMaster
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Waikiki Aquarium Effluent Discharge System Upgrade
<br />Honolulu, Hawaii
<br />2023
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑� Check if project performed with current firm
<br />a'
<br />Senior Civil Engineer. Evaluated and designed upgrades for the aquatic life exhibit effluent disposal system to
<br />meet the NPDES regulatory requirements. Served the role of Project Manager and Technical Lead of the Design
<br />Team for the preparation of construction plans, specifications, and cost estimates.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Saddle Road — West Side Mamalahoa Hwy (SR 190) to MP 41 (Daniel k.
<br />Inouye Hwy)
<br />2010
<br />Island of Hawai'i, Hawai'i
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br />b'
<br />Senior Engineer. This project was a 10-mile new alignment bypass of the old Saddle Rd. on the Big Island of
<br />Hawai'i. The project was performed for the Federal Hwy Administration, the Central Federal Lands Hwy Division,
<br />and HDOT-Hwy Division. Responsibilities: Performed hydrologic and hydraulic analyses and recommended
<br />drainage improvements to be included in the Preliminary Design Plans.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />Honolulu Rail Transit (East Kapolei to Aloha Stadium)
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Honolulu, Hawaii
<br />2010
<br />I
<br />C.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br />Senior Engineer. Performed hydraulic and scour analysis of the rail columns at the channel/stream crossings
<br />near the junction of H2 and Farrington Hwy and near the intersection of Kualakai Pkwy and Hoomohala Ave.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Lone Mountain/Beltway Detention Basins and Gowan Beltway Chnl
<br />Clark County, Nevada
<br />2008
<br />I
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br />Senior Engineer. This project consisted of 600 acre-feet dual detention basins connected by a balance conduit
<br />with a dual level of outfall flow control & a number of inflow storm drains and channels, including a 2-mile inflow
<br />d.
<br />channel that conveys up to 3800 cfs. Responsibilities: Performed hydrologic analyses for a drainage area over 10
<br />sq. mi.; coordinated with another engineering firm in reconciling the hydrology of the project with that of the Las
<br />Vegas Valley 2008 Master Plan Update; performed hydraulic analyses and design of the drainage facilities that
<br />included dual detention basins, emergency spillways, balance conduit, dual level outfall orifices, stepped spillway
<br />channels, inflow storm drains and channels with energy dissipaters; prepared design report; QA/QC of plans and
<br />specifications
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Gowan Outfall Lone Mountain Branch — Rancho to Decatur
<br />Las Vegas, Nevada
<br />2008
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br />Senior Engineer. This project was a 2.2-mile storm drain system that consisted of RCBs ranging from 6-ft X 6-ft to
<br />14-ft X 7-ft and conveyed up to 1600 cfs. Responsibilities: Performed hydraulic analyses and design of the 2.2-
<br />e.
<br />mile RCB storm drain system that includes the mainline, laterals, and drop inlets; reviewed drawings and plans
<br />for quality control and quality assurance; prepared 30%, 70%, 90%, and final hydraulic design reports; identified
<br />and resolved
<br />utility conflicts; coordinated with City of Las Vegas, Clark County Regional Flood Control, and Nevada Department
<br />of Transportation
<br />STANDARD FORM 330 ( REV. 7/2021) PAGE 1