E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT -C
<br />(Complete one Section E for each key person.) CwManjt
<br />12. NAME
<br />Michael J. Foley, Ph.D., PE
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Oceanit Laboratories, Inc, Honolulu, Hawai'i
<br />13. ROLE IN THIS CONTRACT
<br />Hydraulic Engineer/Coastal Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />17 1 17
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Ph.D. Civil Engineering, 2015 Professional Engineer,
<br />M.S. Civil and Environmental Engineering, 2011 Civil Engineering Class,
<br />B.A. Environmental Science: Concentration in Physics, 2006 State of Hawai'i PE-17342
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Dr. Foley is a Civil, Ocean and Environmental Engineer with years of experience in engineering analysis and design services as well
<br />as environmental assessment and monitoring projects. His specialties include hydraulic and hydrologic analysis and design, coastal
<br />engineering and environmental planning and permitting.
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />Kahana Regional Beach Erosion Mitigation
<br />Lahaina, Hawai'i
<br />a.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Principle Investigator. Approximately 3/ mile of shoreline developed with nine condominium complexes is exposed to severe
<br />shoreline hazards due to beach and shoreline erosion. Dr. Foley lead the design of a shoreline restoration project, assessment
<br />of multiple design alternatives, preparation of an environmental impact statement, and community outreach.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />I CONSTRUCTION (If applicable)
<br />2021
<br />Portlock Road Drainage Outfall Improvements
<br />Honolulu, Hawai'i
<br />b.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer. An existing nearshore breakwater protecting the outlet of an existing at municipal stormwater drainage outfall
<br />was damaged. Dr. Foley design a replacement coastal structure to mitigate wave energy, sediment transport and drainage
<br />issues at the shoreline. The project involved evaluation of coastal dynamics, innovative structure design, environmental
<br />permits, land use entitlements, construction plans, specifications, cost estimate, and post design services.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If applicable)
<br />Flood Hanalei Fishpond Wetlands,
<br />Hanalei, Hawai'i
<br />C.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer. A development was being planned for a coastal wetland area. Oceanit evaluated the coastal dynamics,
<br />shoreline
<br />erosion stability, flood hazard areas and elevations, and wetland ecosystem.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />I CONSTRUCTION (If applicable)
<br />Hale'iwa and Waialua Flood Mitigation Study
<br />Waialua, Hawai'i
<br />d.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer. Assessed the existing flood situation for the Helemano/ Paukauila/ Kaukonahua Watersheds and developed
<br />conceptual alternatives to reduce flooding in the area. Hydrology and hydraulic modeling was conducted to identify the flood
<br />areas and design concepts were developed that may be implemented throughout the watershed to reduce flooding.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />I CONSTRUCTION (If applicable)
<br />Ke6pu-Hienaloli Streams Flood Control Project
<br />Kona, Hawai'i
<br />e.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer. Conducted a hydrological analysis of the watershed area including eight flood levels (2-year, 5-year, 10-year,
<br />25-year, 50-year, 100-year, 200-year and 500-year storms). Identified and assessed existing flood control and drainagefacilities
<br />within the project area. Developed a hydraulic design analysis for a proposed flood reduction plan.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />Chang Property Shoreline Protection
<br />Waimanalo, Oahu, Hawai'i
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />f.
<br />Project Manager. Provided an emergency, temporary repair design to stabilize the shoreline and reduce the risk to the
<br />property. An engineering assessment that used background information provided by the client and historical shoreline erosion
<br />data was done to develop options for a longer -term shoreline erosion control. This assessment report was the basis for
<br />discussions with DLNR — Office of Conservation and Coastal Lands and other agencies to discuss shoreline protection options.
<br />Design fee: $19,000.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />Lydgate Ponds Repair Project
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Lihue, Hawai'i
<br />2014
<br />I
<br />g'
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Civil / Ocean Engineer responsible for restoration of the Lydgate Park swimming ponds by repairing the existing breakwater
<br />and dredging sand material. The scope of work included providing a bathymetric survey, detailed construction plans,
<br />specifications, cost estimates, bid proposal, bidding phase services for dredging, dewatering, and disposal of materials.
<br />Engineering cost: $76,950.
<br />STANDARD FORM 330 ( REV. 7/2021)