Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT -C <br />(Complete one Section E for each key person.) CwManjt <br />12. NAME <br />Michael J. Foley, Ph.D., PE <br />15. FIRM NAME AND LOCATION (City and State) <br />Oceanit Laboratories, Inc, Honolulu, Hawai'i <br />13. ROLE IN THIS CONTRACT <br />Hydraulic Engineer/Coastal Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />17 1 17 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Ph.D. Civil Engineering, 2015 Professional Engineer, <br />M.S. Civil and Environmental Engineering, 2011 Civil Engineering Class, <br />B.A. Environmental Science: Concentration in Physics, 2006 State of Hawai'i PE-17342 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Dr. Foley is a Civil, Ocean and Environmental Engineer with years of experience in engineering analysis and design services as well <br />as environmental assessment and monitoring projects. His specialties include hydraulic and hydrologic analysis and design, coastal <br />engineering and environmental planning and permitting. <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />Kahana Regional Beach Erosion Mitigation <br />Lahaina, Hawai'i <br />a. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Principle Investigator. Approximately 3/ mile of shoreline developed with nine condominium complexes is exposed to severe <br />shoreline hazards due to beach and shoreline erosion. Dr. Foley lead the design of a shoreline restoration project, assessment <br />of multiple design alternatives, preparation of an environmental impact statement, and community outreach. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />I CONSTRUCTION (If applicable) <br />2021 <br />Portlock Road Drainage Outfall Improvements <br />Honolulu, Hawai'i <br />b. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Project Engineer. An existing nearshore breakwater protecting the outlet of an existing at municipal stormwater drainage outfall <br />was damaged. Dr. Foley design a replacement coastal structure to mitigate wave energy, sediment transport and drainage <br />issues at the shoreline. The project involved evaluation of coastal dynamics, innovative structure design, environmental <br />permits, land use entitlements, construction plans, specifications, cost estimate, and post design services. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (If applicable) <br />Flood Hanalei Fishpond Wetlands, <br />Hanalei, Hawai'i <br />C. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Project Engineer. A development was being planned for a coastal wetland area. Oceanit evaluated the coastal dynamics, <br />shoreline <br />erosion stability, flood hazard areas and elevations, and wetland ecosystem. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />I CONSTRUCTION (If applicable) <br />Hale'iwa and Waialua Flood Mitigation Study <br />Waialua, Hawai'i <br />d. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Project Engineer. Assessed the existing flood situation for the Helemano/ Paukauila/ Kaukonahua Watersheds and developed <br />conceptual alternatives to reduce flooding in the area. Hydrology and hydraulic modeling was conducted to identify the flood <br />areas and design concepts were developed that may be implemented throughout the watershed to reduce flooding. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />I CONSTRUCTION (If applicable) <br />Ke6pu-Hienaloli Streams Flood Control Project <br />Kona, Hawai'i <br />e. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Project Engineer. Conducted a hydrological analysis of the watershed area including eight flood levels (2-year, 5-year, 10-year, <br />25-year, 50-year, 100-year, 200-year and 500-year storms). Identified and assessed existing flood control and drainagefacilities <br />within the project area. Developed a hydraulic design analysis for a proposed flood reduction plan. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Chang Property Shoreline Protection <br />Waimanalo, Oahu, Hawai'i <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />f. <br />Project Manager. Provided an emergency, temporary repair design to stabilize the shoreline and reduce the risk to the <br />property. An engineering assessment that used background information provided by the client and historical shoreline erosion <br />data was done to develop options for a longer -term shoreline erosion control. This assessment report was the basis for <br />discussions with DLNR — Office of Conservation and Coastal Lands and other agencies to discuss shoreline protection options. <br />Design fee: $19,000. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />Lydgate Ponds Repair Project <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Lihue, Hawai'i <br />2014 <br />I <br />g' <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Civil / Ocean Engineer responsible for restoration of the Lydgate Park swimming ponds by repairing the existing breakwater <br />and dredging sand material. The scope of work included providing a bathymetric survey, detailed construction plans, <br />specifications, cost estimates, bid proposal, bidding phase services for dredging, dewatering, and disposal of materials. <br />Engineering cost: $76,950. <br />STANDARD FORM 330 ( REV. 7/2021) <br />