Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT -C <br />(Complete one Section E for each key person.) CwManjt <br />12. NAME <br />Linyan Li Goo, PhD, PE <br />15. FIRM NAME AND LOCATION (City and State) <br />Oceanit Laboratories, Inc, Honolulu, Hawai'i <br />13. ROLE IN THIS CONTRACT <br />Hydraulic Engineer/Coastal Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />4 4 <br />-1b. tuUL;A I IUN (uegree ana specianzaiion) "I /. UUNNtN I NKUt-tssIUNAL NtUls I NA I IUN (state ana uiscipune) <br />BS Environmental Engineering 2008 State of Hawaii Professional Engineer License No. 20193 <br />MS in Environmental Science and Engineering (2011) <br />PhD in Ocean and Resources Enaineerina (2018) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Yamazaki Y., Bai Y., Goo L.L., Cheung, K.F., Lay, T. (2023). Nonhydrostatic Modeling of Tsunamis from Earthquake Rupture to <br />Coastal Impact. Journal of Hydraulic Engineering. [accepted in March 2023] <br />*Li, L., Cheung, K.F. (2018). Numerical dispersion in non -hydrostatic modeling of long -wave propagation. Ocean Modeling. doi: <br />10.1016/j.ocemod.2019.05.002. <br />*Li, L., Cheung, K.F., Yue, H., Lay, T., and Bai, Y. (2016). Effects of dispersion in tsunami Green's functions and implication forjoint <br />inversion with seismic and geodetic data: a case study of the 2010 Mentawai Mw 7.8 earthquake. Geophysical Research Letters, <br />43(21), 11182-11191. <br />*Li, L., Lay, T., Cheung, K.F., and Ye, L. (2016). Joint modeling of teleseismic and tsunami wave observations to constrain the 16 <br />September 2015 Illapel, Chile Mw 8.3 earthquake rupture process. Geophysical Research Letters, 43(9), 4303-4312. <br />* Work published under maiden name Li <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />Kahana Nui Basin Dam Improvements, Maui, Hawaii <br />PROFESSIONAL SERVICES <br />I CONSTRUCTION (If applicable) <br />ongoing <br />a <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Project Engineer. Performed Hydrologic and Hydraulic modeling for the Kahana Nui watershed and reservoir using USACE's <br />HEC-HMS and HEC-RAS (2D) model systems; Evaluated downstream flooding effects under various dam improvement <br />alternatives; Prepared Hydrologic and Hydraulic Analysis Report and Downstream Flooding Effects Report. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2021 <br />I CONSTRUCTION (If applicable) <br />Ala Wai Watershed Flood Mitigation, Honolulu, Hawaii <br />b <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Project Engineer. Performed hydrologic and hydraulic modeling using HEC-HMS and HEC-RAS for various frequencies of flood <br />events to assess hazards for the Ala Wai Watershed; Evaluated conceptual designs involving a set of tunnels, combined with <br />ideas suggested by the community. Modeling results provided critical information for the design phase. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2021 <br />I CONSTRUCTION (If applicable) <br />Kalakaua Floating Bridge Flow Condition Analysis, Honolulu, Hawaii <br />C. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Project Engineer. Conducted hydraulic analysis to evaluate flood impacts of constructing a bridge, crossing Kalakaua bridge, <br />along the Ala Wai Canal. Prepared a report to document the findings and potential impacts on general flood condition in the <br />adjacent areas due to the proposed project. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />I CONSTRUCTION (If applicable) <br />Kahana Bay Erosion Mitigation, Kahana, Maui, Hawaii <br />d. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Coastal Engineer. Performed wave climate data analysis to define typical swell events for coastal erosion. Developed DEM <br />(digital elevation model) by incorporating multiple data resources including Lidar, Multibeam, and Nautical charts etc. <br />Performed wave modeling using SWAN (Simulating Waves Near Shore) to evaluate wave impacts and worked on beach <br />stabilization structure design. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2021 <br />CONSTRUCTION (If applicable) <br />Mangrove Eradication at Keehi Lagoon for DOT Airports, Honolulu, <br />Hawaii <br />e. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Project Engineer/Construction Inspector. Conducted periodic BMP and environmental compliance inspections. Prepared written <br />reports and photo log to document work progress. Helped on logistics/coordination/meeting minutes of regular project progress <br />meetings. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />I CONSTRUCTION (If applicable) <br />Pahonu Beach Restoration, Waimanalo, Hawaii <br />on oin <br />f <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />Project Engineer. Performed offshore wave buoy data analysis. Collected exisiting oceanographic data for coastal hazard <br />assessment. Compiled topography/bathymetry data for development of digital elevation model (DEM) around the project site; <br />Created high -resolution elevation maps using ArcGIS; Performed wave modeling. <br />STANDARD FORM 330 ( REV. 7/2021) <br />